Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5958

User management bottleneck in CLM Suite

As an Enterprise User Administrator for DOORS NG, the model for user to project administration in the expanded CLM suite requires automation to keep up with 2000+ users and 100s of projects when managing down to roles and project teams. When consi...
almost 6 years ago in IBM Engineering - Test Management / Administration 1 Not under consideration

RQM baselines to be reported with REST-API

Case ID : TS001880214 Local Baselines needs to be supported with the project feed, as documented in https://jazz.net/wiki/bin/view/Main/RqmApi : /resources/ /baseline should return local baseline when local CM is enabled (Baseline only mode). Even...
almost 6 years ago in IBM Engineering - Test Management / Integrations 2 Not under consideration

change view dropdown size

The view dropdown in modules only shows 22 chars when collapsed and 26 chars when expand the dropdown. When you have many views or lang names, it's difficult to distinguished them. (TS001971298)
almost 6 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Module functions 3 Not under consideration

JRS ( Report Builder) does not display the full hierarchy of the category from RTC - It shall be configurable in JRS or RTC

If we have 3-4 layers of the category (filed Against) in JRS, The JRS only displays two layers. I had an exchange with Fariz and learned that its designed that way to solve some performance issue. However, Fariz also suggested to proceed with the ...
12 months ago in IBM Engineering - Reporting / JRS 1 Future consideration

SCM - Check if a Stream or Component name is unique

Current situation: If a new stream or component in SCM will be created SCM does not check if the same stream or component name already exists in the PA. This could lead to confusion for the SCM users. Required situation/Proposal: It is requested t...
12 months ago in IBM Engineering - Workflow Management / Source Control 2 Future consideration

Crosscheck/clarify how attachments are referenced in ETM artefacts

Currently the attachment referencing is done based on the naming of the attachment and not via the combination name + ID. In case an attachment is removed from the test artefact (e.g. test case) it is not possible to identify in the history of the...
12 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

SCM upload status in Web View

Current behavior: When uploading a new document, there is no status regarding the upload state Requested change: When uploading a new document, to have a status regarding the upload state (E.g. in % (percentage)). It should be visible that there i...
12 months ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Maximo Mobile - Sliding Drawer Behavior - Error Handling - During save in Sliding drawer if any error occurs, then user can not edit the input in sliding drawer because sliding drawer gets closed and then user need to redo everything

In Maximo Mobile, there is a sliding drawer component. In this, user fills all the input and then click on save. If any error occurs during SAVE, then error message will show. Post error message, user cannot come back to SLIDING DRAWER component. ...
12 months ago in IBM MAS - Mobile 2 Not under consideration

DNG data counters

Wiki https://jazz.net/wiki/bin/view/Deployment/RequirementsManagement70Performance#DataLimits is used by customers as a reference guide for upgrading to 7.x. While the documentation above provides data limits to be observed in DNG it fails to prov...
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Documentation 0 Not under consideration

Work Item Copy should be able to include links

When creating a Work Item copy using the 'Create Work Item Copy' button on the work item form, users would like the option to also copy existing links from the source work item to the target. Today only the 'copied from' and 'mentions' are populat...
almost 3 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration