Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Workflow Management

Showing 524

source.epoch/source.timestamp available as a system variables for a z/OS translator

like @{source.version}, is usable for audit/tracing etc, when running zOS translators, the actual changetime of the file, would be more accurate. As the internal epoch time allready is available, and is stored into build maps etc, this can ensure ...
over 1 year ago in IBM Engineering - Workflow Management / Enterprise Extensions 1 Future consideration

Provide a file chooser widget in work items to choose a file path

We often wish to record the path to a file in work items, but there is no attribute for that. The Attachments non-attribute-based presentation actually uploads a file, but we don't want to do that -- just obtain the path. This would be a big time ...
over 1 year ago in IBM Engineering - Workflow Management / Work Items 2 Not under consideration

Hide "Associate Change Request" functionality if prerequisites for usage of the function are not given

In EWM, link types are only available when they can actually be used. For example "Tracks Requirement" is only visible, if there is an associated RM project area. In SCM, this is not the case for the link type "Associate Change Request". This lin...
over 2 years ago in IBM Engineering - Workflow Management / Source Control 3 Future consideration

Eliminate Redundant Mails for Work Items.

User want an email if someone tags user in a work item and want an email if someone modifies a work item that he own. But if someone tags user in a work item that he own receive 2 emails. So, User would like to receive only one notification for th...
over 1 year ago in IBM Engineering - Workflow Management 1 Not under consideration

Ability to select and delete multiple plans in one go or ability to deleted them from server

Today the plans keeps getting created and the it slows down the system. so ideal thing will be to have a server level setting which could auto delete all the plans as per the configuration. In addition, there shall be a provision to delete multipl...
over 1 year ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Update the Eclipse Kepler reporting version to a newer one

The current version of Eclipse (Kepler) is from 2013 and has a number of vulnerabilities when supporting BIRT Report Designer. A new version would provider more stability towards the BIRT RD when reports are built and utilised in Eclipse.
almost 3 years ago in IBM Engineering - Workflow Management 2 Not under consideration

Auto Refresh on Kanban and TaskBoard

After awhile working on Kanban, user just figure that some WI was updated by someone else just when trying to save changes, sometimes even losing the content update at the same Task, Defect, History or other kind of WI. Would help lot of if instea...
over 5 years ago in IBM Engineering - Workflow Management / Planning 3 Not under consideration

EWM Eclipse Client iFixes in Installation Manager format

Currently all fixes for the eclipse clients are only delivered as P2 installs.This is a huge problem, as IDz and other IBM based eclipse tools all use(require) Installation Manager to install the products.Currently only the initial release of the ...
about 4 years ago in IBM Engineering - Workflow Management / Installation 0 Future consideration

Ability to hide sections depending on content

I would like to be able to hide a whole section including the header depending on the content of the section - e.g. if all attributes are hidden (e.g. because they are empty), the section should be hidden as well.
over 5 years ago in IBM Engineering - Workflow Management / Administration 4 Not under consideration

Stop creating duplicate links through RTC- GitHub squash commit

RTC 6.0.3 and above versions are allowed to create duplicate links in Workitems
about 4 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration