Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5986 of 5986

Digital - cooking gas manufacturing machine equipment from water with storage probe end feature with digital measured output applicable in small plant etc

international standard based containerization of cooking gases manufacturing /equipment manufacturing and storing the gases like methane, propane, butane, pentane in containers in liquid form in appropriate measure by water transformation, these f...
about 1 year ago in IBM Engineering - Foundation/Common Services / Usability 1 Not under consideration

Custom Stereotype for Activity not Accessible in ObjectModelDiagram (Block Definition Diagram) Toolbar

Dear all, I'm searching for a way to insert an "Activity" inside a "Block definition diagram". I found, that the "ActivityBox" for the Drawing Toolbar does the job. My Problem is, that I want to define a SystemProcess Stereotype. The Problem is, t...
about 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Water based jet airoplane Engine manufacturing

Less expensive travel by hydrogen fueled engine by inbuilt water splitting application by applying the particular energy level applicable for ship- train engine bus another vehicles etc
about 1 year ago in IBM Engineering - Foundation/Common Services / Performance 1 Not under consideration

Cannot edit the Inspection form name after it is activated

Application: Maximo Inspection Form This enhancement is requested for the version 761X.
over 3 years ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Exclude records from Report Object Structure

Need a way to exclude records from object structures for the purpose of ad-hoc reports. For example, exclude tasks from a WO ad-hoc report. More info here: Exclude rows from object structures via WHERE clause
over 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

No report about the role permission information of a project area possible

It is not possible to make a report of the roles-permission information of a project area. - The first picture in the pdf document shows the role permission information on the web UI- the second picture in the pdf document shows the role permissio...
over 5 years ago in IBM Engineering - Foundation/Common Services / Unassigned 5 Not under consideration

Research for finding out water splitting energy level for device manufacturing for its signal enhanced application for manufacturing hydrogen for water based engines

at a particular energy level binding energy of water losses and splits into hydrogen and oxygen we should have to find the energy level and its proper application for signal enhanced application to convert large amount of water splitting it for ma...
about 1 year ago in IBM Engineering - Foundation/Common Services / Systems Engineering 1 Not under consideration

Have the ability to restrict the number of concurrent test script execution by command-line test script type.

We have 1000+ test suites that are map one to on to 1000+ test cases that all call a set of common command-line test scripts. Test suites are used to execute the test scripts in a fixed order. All of these test scripts can execute on all 80+ adapt...
about 1 year ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Water splitting application for inbuilt machines using hydrogen as fuel storing water for running the engine

There is a catalyst known as Nickel iron oxide we can apply recording and signal and its enhancement application we can convert more water for splitting for collecting hydrogen instead of recording catalyst activity we can apply measuring the cata...
about 1 year ago in IBM Engineering - Foundation/Common Services / Systems Engineering 1 Not under consideration

Organize and maintain links and attachments separately based on the context in work item

If a work item has several links and attachments, it should be possible to organize them for improved readability. By using additional link sections, user should be able to organize links and attachments in specific link tabs (sections). Currently...
over 4 years ago in IBM Engineering - Workflow Management / Work Items 3 Future consideration