Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5912

work task sequencing

When multiple workgroups are involved with one work order, it is challenging to document all the communications involved and link the various work tasks. We would like to know if there is a way to build in work task sequencing that would help trig...
over 1 year ago in IBM TRIRIGA Operations & Maintenance Management 3 Not under consideration

Support free choice of file encoding for code generation

https://www.ibm.com/support/pages/customize-code-generation-using-ibm-rational-rhapsody-c#unicode shows that the file encoding of source code files generated by Rhapsody have a fix file encoding which depends on the selected Rhapsody GUI language....
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 2 Future consideration

DNG Copy Component Views

DNG - With Configuration management switched on you do not have the ability to Copy Views easily between components.We have a Standard Configuration we are packaging in a DNG Project and Component.We can then pull changes in from this component to...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Formatting of long description preview in Technician

Using the rich text editor, users working in the Technician app have the ability to add bullet lists, bold text, etc to the long description field. However, the long description preview showing in the work order details screen does not consider th...
over 1 year ago in IBM MAS - Mobile 1 Not under consideration

Add a "Copy Log to Clipboard" button on message boxes that output logging such as 'Apply Requirements Change Request'

the viewport for logging output in those message boxes is usually only a few lines, where as logging can span dozens or more lines. For usability and supportability, it is often required to copy the log output for later processing and analysis. Th...

Enhancement to improve Rich Hover summary for links

When RTC (Rational Team Concert) is presenting the linked DM resource (e.g. class) to its user on WEB UI, it is expected to display a pop-up window with the summary of relevant information about it when the mouse is placed over the link. Such info...
almost 9 years ago in IBM Engineering - Systems Design Rhapsody/RMM 4 Future consideration

Return Room search Add-In Results in Batches

Problem Statement : When searching for rooms from large multi-floor buildings where there are 100+ rooms, it takes a while to load room results in Add-in. Proposed Solution : Take into account loading results in batches. Show a specified amount of...
over 2 years ago in IBM TRIRIGA Application Platform 1 Future consideration

Storeroom restrictions are not applied in MIF

As detailed in the case TS005052239 : Storeroom restriction are correctly applied in Maximo applications. But theses restrictions are not applied during MIF interactions.
almost 4 years ago in IBM MAS - Aviation 0 Future consideration

ISO 26262 Kit shall be certified for DOORS 9.7.x.

The ISO 26262 Kit is only certified for the DOORS 9.6 code stream https://www.ibm.com/support/pages/download-ibm-rational%C2%A0doors-safety-manual This shall be updated so DOORS 9.7 is also certified

Move artifacts between DNG projects

We need the ability to move requirements from one DNG project into another project, such that when requirement ownership changes requirements can easily be migrated and living with the correct project owner.
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration