Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 6079 of 6079

"Previous Result Details" in TCER/TSER should modify

According to test engineers, the name "Previous Result Details" in TCER/TSER will cause mis-understanding, as they only tested once, and ignore this as it is previous result. Better to modify the name in TCER/TSER to avoid mis-leading.
about 1 month ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Ability to print the pdf copy of the completed Inspection form

Ability to generate PDF report of the Inspection form and results which can be attached to the Work Order as a linked document.Would like to have the same look and feel like the inspection form, also would like to trigger the pdf report from the W...
over 3 years ago in IBM MAS - Manage (Base) 6 Future consideration

Drag and drop functionality- Drag the text value from one text box and paste it into another textbox / field.

It would provide the users with the ability to drag and drop the text value from one textbox into another text box instead of performing copy (CTRL+C) and paste (CTRL+P) option. Previously in Maximo 7.6 version this ability was present, and user w...
2 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Autogenerates "implemented by" links on the modified artifact, once the CS is delivered to the stream.

when linking CS to a work item we loose this traceability when the CS is delivered to the stream. It would be nice to have a feature that autogenerates "implemented by" links on the modified artifact, once the CS is delivered to the stream.
3 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Future consideration

Queue SMTP Emails when SMTP Server is Unavailable

There are various scenarios in Maximo where email is sent explicitly from the various MXServer.sendEmail() methods. For example, the PM WOGEN cron task. If the email fails to send to the SMTP server (such as the SMTP server is down) it's gone fore...
about 4 years ago in IBM MAS - Manage (Base) 3 Future consideration

Ability to monitor Maximo Mobile usage through the LOGINTRACKING table

To enable closer monitoring of Maximo Mobile usage, it would be beneficial if there was a YORN attribute or similar on the LOGINTRACKING records indicating whether or not a user was logged in through Maximo Mobile.
over 1 year ago in IBM MAS - Mobile 2 Not under consideration

Allow lookups to have a date filter (could be used for rolling dates etc)

It would be beneficial if you could have a date filter auto populate based on the current date. E.G. Setup a lookup that shows only workorders due (todays date + 30 day) or workorders previously due (todays date - 30) by default. Still allowing th...
about 1 month ago in IBM MAS - Manage (Base) / System Admin Config/Security 2 Needs more information

ESG for Airports as per ACI.Aero framework

ACI.Aero is international organisation for all the airports in the world. Soon all airports will have to follow the ESG framework for ACI . The framework consist of various parameters which are beyond GRI, TFCD and other frameworks like noise poll...
about 1 month ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 0 Under review

Need documentation and support for COBOL to Java interoperability builds

Customer would like to use cjbuild in an EWM EE build on z/OS to manage COBOL to Java interoperability programs. A tutorial or sample on how to configure such a build in EWM is needed.
4 months ago in IBM Engineering - Workflow Management / Enterprise Extensions 3 Not under consideration

Ability to select all dependencies when delivering changes between streams

When delivering changes from one stream to another, we occasionally encounter dependencies that we may want to ignore. We must select each dependency to ignore one by one. If a "Select All" button could be added, this would save us time. We've had...
7 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration