Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5910

Allow for the deletion of the last remain line on a PO with a revision created by the MIF using IFace tables.

Currently when POs are revised with the MIF, Maximo does not allow the deletion of the last line. Since PO revisions are handled by the MIF as lines in the incoming revision are compared against current lines, it is assumed that if a PO comes in w...
about 3 years ago in IBM MAS - Manage (Base) / Integration 0 Future consideration

Export DNG ->Import DNG: “Initial value” setting not imported correctly for Attributes (“Initial Value” setting empty after i

Steps to reproduce: 1. Home DNG: Artifact Attribute definition with non-empty value in “ Initial value”2. Home DNG: Export ReqIF3. Away DNG: Import ReqIF
almost 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

Rhapsody : Statecharts don't support 'doActivities'

UML defines the concept of a 'doActivity' to support concurrent activities in state, but Rhapsody does not support these. Support the PSSM and doActivities
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Ability to filter Module Comments

When a module is reviewed that has 30 comments in it. Its not particularly easy to only see the ones you added. So adding the ability to filter them would enhance the product. If this feature isn’t implemented the user will need to either scroll u...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next 0 Not under consideration

Require DNG Pre Save and Post Save Operation Advisors and Participants

We need some extensions points while saving DNG Artifacts in form of PRE Operation Advisor and POST Operation Advisor to perform validation. A similar functionality in RTC Exists.
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Export to excel missing Group by column name list but has "Group"

Create a Report in /p/web/reporting Reporting from Query say ALL Leases.After the Report produce the output, from Lease category column hamburger menu, select Group by Lease category, and save changes.The report groups by Lease category, click the...
over 1 year ago in IBM TRIRIGA Reporting 0 Future consideration

Validity of links should be affected by certain attributes changes

Validity of links should be affected by certain attributes changes Contents Max. Min. Name Typ. Verification Criteria Baseline should not have changed link validity
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

In DNG any option to include default users and some attributes to be included in the comments email template in DNG?

Would like to know if there is a feature in current or upcoming version of DNG which gives the option to include, default users (as per the interest of project owner) and some attributes to be included in the comments email template in DNG? lookin...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 4 Not under consideration

Maximo Mobile - Ability to manually enable offline mode

Request for the capability to manually turn on offline mode across all aspects of Maximo Mobile (Technician, Inspection .etc). This is a significant issue for Australian customers due to poor, intermittent connectivity (fringe reception), and I un...
over 3 years ago in IBM MAS - Mobile 4 Not under consideration

Transaction audit functionality

The FLIs updated in TS003102608 P1 did not have back-up records documenting the balance update•FLIs as a whole do not have evidence, through the UI, of back-up records documenting balance updates. Current audit support requires a combination of re...
almost 5 years ago in IBM TRIRIGA Real Estate & Lease Accounting Management 3 Planned for future release