Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5790

enforce actual result field based on presence of requirement or defect

provide a pre-condition to enforce an actual result on manual steps with a linked requirement or defect
over 3 years ago in IBM Engineering - Test Management / Test Execution 1 Not under consideration

required manual step attribute should be required if its column is not displayed during execution

If a manual step attribute is required it should be required even if the column for that manual step attribute is not displayed during test execution. There is no way to enforce what columns are displayed which makes this required attribute unreli...
over 3 years ago in IBM Engineering - Test Management / Test Execution 1 Not under consideration

Add the capability of adding OSLC links with Modelling Toolbox into the RMM profile

By using Modeling Toolbox helper, in Rhapsody models using RMM, architects have the possibility to select RhapsodyModelManager as Profile and OSLClink as stereotype for dependencies to be created.Still, this scenario is not working as expected: it...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Enable feature window for multiple selected tags

We are using tags to define properties and each element has multiple tags.Modifying each tag from browser takes much effort so we filtered tags using table views. If we select multiple tags in table view and try to trigger feature window, rhapsody...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Model Checker not reporting on packages for those are in "UnResolved" state

We would like to have model checker to report on unresolved packages on Package Level.
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Plan upload time is slow due to excluding work-item on the Web-UI client and not DB

As a matrix organization, we have traditional (not quick planner) plans with many exclusions, the screening out is not done on the DB fetching (SQL query) but is done on the Web-UI client side, which takes triple time and more to load/refresh.
almost 7 years ago in IBM Engineering - Workflow Management / Planning 2 Not under consideration

Tablet friendly review elements

OK ... Why isn't this tool more mobile friendly when possible? Specifically why am I unable to do a Requirements review OR a Test plan review from a tablet device in a mobile friendly way? If I was an exec using a table to review the status of a p...
over 3 years ago in IBM Engineering - Foundation/Common Services / Documentation 0 Future consideration

Possibility to have different names/labels for activity diagram used as call behavior action in another activity diagram

We have activity diagram A used in another activity diagram B as call behavior action. But when we change the name of the activity diagram A, not only name and label of activity diagram A are changed, but also the label of the call behavior action...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration

API to check Remote Artifacts Loaded or Not

We have written a plugin to create classes based on remote requirement id. Once after logging into Remote Artifact Package(RM) using loginToRemoteArtifactServer(), then we are populating the requirements and we trying to fetch the requirements(pre...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration

RQM (Not) Versioned Executable Variables

Using RQM we noticed that Executable Variables are not versioned and they are the same across the Streams. Basically if we edit / add / delete an executable variable in RQM, this change is reflected in all the other Project Area's streams. We woul...
almost 7 years ago in IBM Engineering - Test Management / Unassigned 3 Not under consideration