Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5853

Need append option to import from text to an existing module, embedded artifacts also move into the existing artifacts folder

A user should have the ability to append imported artifacts to an existing module, so that new base artifacts are added to the existing module including any embedded artifacts. The appending option is available in Classic DOORS, but not DOORS Next...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

Rhapsody API Support to move model browser elements

We would like to have the possibility of moving elements in rhapsody browser like moving a proxy port above another as we would drag and drop it between two other proxy ports or move an enumeration literal up or down as if you would click on the “...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Plan upload time is slow due to excluding work-item on the Web-UI client and not DB

As a matrix organization, we have traditional (not quick planner) plans with many exclusions, the screening out is not done on the DB fetching (SQL query) but is done on the Web-UI client side, which takes triple time and more to load/refresh.
almost 7 years ago in IBM Engineering - Workflow Management / Planning 2 Not under consideration

Layout Feature for Action,CallBehaviour,CallOperation to rearrange action pins in Activity Diagram

Actor : Layout Feature for Action, CallBehaviour, CallOperation to rearrange action pins. Description: We have Call Behaviour action to a SysML activity diagram to invoke the behaviour of another activity. For the call behaviour we have action pin...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

RQA - change design of dialog-box

The dialog-box design shall be more user-friendly:a) The scrollbars must not be shown after starting the scriptb) The column-width shall be optimized (i.e. the first column "Identifier" and "Score" are too large showing senseless empty space!)
over 3 years ago in IBM Engineering - Requirements Quality Assistant / Administration 1 Future consideration

RQA - show version of RQA addon

The version of the RQA addon must be shown in the user-interface!I.e. showing the version-string ("02.02.2021") in the title of the window.
over 3 years ago in IBM Engineering - Requirements Quality Assistant / Administration 2 Planned for future release

ARXML Import via RhapsodyCL

Importing of arxml files via command line requires use of Rhapsody.exe as mentioned here: https://www.ibm.com/support/knowledgecenter/SSB2MU_9.0.0/com.ibm.rhp.autosar.doc/topics/rhp_c_import_export_autosar_xml.html We have CI/CD enabled for our pr...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / AUTOSAR 1 Future consideration

Adjust user points of lines drawn on diagrams via Java API

Problem: There is no method provided in Rhapsody API to rearrange the lines/connectors on diagram by changing the position of the user points. The user points can be changed on diagram via GUI but we intend to do the same via API. Possible Solutio...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Link Validity setting shall be protected by a changeset

Currently the "Link Validity" setting in Component properties can be changed without any Changeset, although changesets are set as necessary."Link validity" should be set as part of a changeset. Furthermore, it should be possible to track when and...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Not under consideration

enforce actual result field based on presence of requirement or defect

provide a pre-condition to enforce an actual result on manual steps with a linked requirement or defect
over 3 years ago in IBM Engineering - Test Management / Test Execution 1 Not under consideration