Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2084

Need a Feature to set DNG attribute default to a value based on another attribute

Reference PMR :TS001680693Need a feature to update an DNG attribute default to a value based on another attribute.
almost 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Job Plan Conditions should work with PM/JP/Route

Currently, Job Plan Conditions aren't honored when WOs are created from a PM that has a Job Plan and a Route. It would be helpful if Maximo could be enhanced so that Job Plan Conditions work in that scenario.
almost 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 2 Not under consideration

Object Structures: Exclude Attributes Mode should work for Report Object Structures too

In the Object Structures application: Currently, Exclude Attributes Mode isn't designed to work for Report Object Structures (Consumed By = REPORTING). Exclude Attributes Mode is only is designed to work where Consumed By = INTEGRATION. See case #...
almost 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

Do you offer a normalized METERREADING fact table?

The in situ METERREADING fact table appears to be de-normalized and as such may accidentally trigger data hazards such as: Fluidity; Ageing; Biasing; Falsification /Misinformation; Disassociation; Masking; Volume; and/or Interpretation. (And/or in...
about 2 years ago in IBM MAS - Manage (Base) 1 Not under consideration

Ad-hoc report text fields: Align-left instead of align-right (optional setting)

Maximo aligns ad-hoc report text fields to the right, instead of to the left. Screenshot: https://i.stack.imgur.com/KrbtZ.png That's different from most software platforms. Other programs like Excel, MS Access, and SQL clients align text to the le...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 2 Not under consideration

BIRT Reports need ability to total all contracts vs just showing totals for each contract.

Although there is a summary total for each contract there is no total of all contracts on the report and exporting the report to consolidate is not efficient due to all the blank rows that have to be removed.
about 1 year ago in IBM TRIRIGA Application Platform 4 Not under consideration

Incomplete mapping cannot be completed without incorrectly importing data

When importing a set of work items from a PA with another base template out of a csv-file, in the source, there may be a field that do not exist in target.There is no problem, if a similar field with a different name exists in the target.But there...
about 1 year ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

[EWM]: Choose column's number by row in dashboard's layout

Hello, Actual : To personalize an EWM dashboard, we need to choose the number of columns (1 to 3) for all the rows. Expected : To personalize an EWM dashboard, we want to choose the number of columns (1 to 3) for each row. It will permits to impro...
about 2 years ago in IBM Engineering - Foundation/Common Services / Usability 1 Not under consideration

BIRT Support for converting base64 images pasted into Task LD field to print to pdf

Maximo allows images to be pasted into Job Plan Task Long Description field, but when you attempt to print to pdf, the images aren't output. The IBM method is to Attach the images using the "Insert Image" URL link feature. While this works, it def...
about 3 years ago in IBM MAS - Manage (Base) / Reporting 1 Not under consideration

Paging the huge set of links as it affect the work items performance

The work items with huge set of links should be paged when there are more then X Links (for example X=10) as it takes more than 30 sec. to load
about 6 years ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration