Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2046

Paging the huge set of links as it affect the work items performance

The work items with huge set of links should be paged when there are more then X Links (for example X=10) as it takes more than 30 sec. to load
almost 6 years ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Add a "select all layers" in the floor plans layer manager

Complex BIM models have a lot of layers available in TRIRIGA. For performance optimization, only a few are displayed by default. Activating them manually, one by one, is a burden. Is it possible to create an "Activate all" checkbox on top of the l...
almost 6 years ago in IBM TRIRIGA Application Platform 4 Not under consideration

installing Mas Manage with SQL Server on one Openshift Cluster using Ansible collection

We are using this documentation for our installation of MAS8 and Maximo Manage https://ibm-mas.github.io/ansible-devops/ We need to deploy MAS Manage with SQL Server Database for our open shift cluster (hosted on azure cloud) The automated manner ...
almost 2 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

Create Views and Read View names from DNG Project via Public API

In DNG Projects Default views should be created by a external script. For that a public API Method for creating a view is needed. After Creation of the View a public API Method for reading all views from a DNG Project or DNG Module is needed.
almost 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Enhancement request following defect 137626 to allow ReqIF Export wizard to advise the export was successful but ended with w

Enhancement request following defect 137626 to allow ReqIF Export wizard to advise the export was successful but ended with warnings due to NPE errors. At present, the ReqIF Export wizard advises users that the export was successful but only revie...
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Importing and representing OLE files from DOORS to DNG in 7.0.1

The new approach to import ResIF frile from Doors to DGN makes all ReqIF embedded objects, like icons, images and Excel tables, (all of which we receive a lot of) to be previewed overlaid on an A4 size page, which causes them to shrink and to have...
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 1 Not under consideration

More Options to set up Preventive Maintenance Calendar Based Frequencies

The ability to set calendar frequencies define by general days, allowing organizations to have a more specific plan based on unconventional shifts or compulsory regulated frequencies. Some examples include: a) Trigger the X day of every X months, ...
12 months ago in IBM MAS - Manage (Base) 4 Not under consideration

Show list tab in list view

After upgrade to using MAS, the list tab removed from list view and that cause all tab group do not show. The list tab is show normally in Maximo 7.6.1 and with a property mxe.webclient.tabBreadCrumbs to control show or hide the tab.
12 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Not under consideration

DOORS shall allow users to easily sort enumerated types

In the enumerated types dialog there shall be options to easily sort enumerated types alphabetically or on related number.
almost 5 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Attributes 2 Not under consideration

Module level artifacts do not have term references stored in OSLC or Reportable API

Currently term references are stored in core artifacts and there is no way to store them in the module level artifacts. It would be good to be able to have a way to decide where we would like the link to be stored in. The steps to fetch term refer...
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Not under consideration