Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5996 of 5996

Creating "Location-based Emissions" on account level for Envizi users

Can you please create "Location-based Emissions" report that will capture monthly consumption, Location-based Emission Factor (kgCO2e/unit), Location-based Emissions (kg CO2e), Location-based Energy (GJ), Location-based Factor Source on the accoun...

Include EcoVadis in the reporting framework

Many companies are spending time on answering on EcoVadis surveys, EcoVadis is constantly changing their details/questions of how they rate companies, and a lot of the information needed to answer an EcoVadis questionaire is or can be gathered in ...
over 1 year ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 2 Future consideration

TWC Updates on John Deere Case for IBM Support

The customer (John Deere, Co) reported this issue over 115 days ago; we have yet to provide a fix/solution. The problem stems from the method and inconsistent results of the data using HOD - Direct APIs through an automated systems and the respons...
6 months ago in Environmental Intelligence Suite: Add-ons / General 0 Future consideration

Use Date/Time formats when exporting Date/Time attributes in Excel

When a user export a view containing user-defined attributes of type Date (or Time or Date-Time), these attributes are not recognized as a date format in Excel, but as plain text. If you export the Excel table from Report Builder, then the Date at...
12 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Future consideration

Display creator, creation date, modifier and modification date for diagrams and model elements

To better enable collaboration and configuration control of models.
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Enhancement request to have define formal gates on sequence diagrams

According to UML specification (2.5.1) interactions can have formal gates (Figure_17.1_UMLSpecification.png). They would allow messages from and to the diagram frame, see Figure_17.4_UmlSpecification.png and Figure_17.14_UmlSpecification.png. The ...
12 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 3 Future consideration

Enable option to add custom attributes in DNG review section

We would like to add our own attributes to the review section where we have only option to add requirements. Example How can one add to this Review overview a column e.g. “Artefact type” to make the review not that much time consuming. So easily w...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

When comparing configurations in DOORS Next provide a way for the user to specifiy attributes to ignore. Also need an option to ignore white space.

It will be very helpful to be able to ignore attribures such as Last Modified and Status as well as ignoring white space differences.
12 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

[CMMC] Distinguish between Active and Inactive Users

As a part of the CMMC program, there is a need to distinguish between Active and Inactive User sessions in the ELM Suite. AC.3.019 requires that user sessions that have been inactive for a specific time period be terminated. In order to implement ...
over 2 years ago in IBM Engineering - Foundation/Common Services 2 Future consideration

Show the progress of an ongoing rebase activity

rebase can take up to a day and there is no progress shown, only in active services it is shown as running
6 months ago in IBM Engineering - Foundation/Common Services / Unassigned 0 Future consideration