Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2084

Changing the pre-selected data filters in data reports

Currently for one of our clients, the data reports have changed to filter by GRESB tags. This has caused issues for us and can potentially cause a lot of issues for the clients or property managers downloading data as half of the portfolio does no...
over 1 year ago in IBM Envizi - ESG Suite / Base Platform 2 Not under consideration

Need to be able to upload a template and have all dynically referenced templates be uploaded with it (inlcuding updating the dynamic references)

Currently we have to manually deploy 20+ templates from the local file system to the document builder server, then update the main template dynamic references to point to the new locations on the server. Each update takes approx 5 minutes to compl...
over 1 year ago in IBM Engineering - Lifecycle Optimization Publishing / Documentation Builder 1 Not under consideration

GWW – Work Priority column to retain background colour after you have assigned labor or crew

GWW – Work Priority column has a background colour. After you start to assign labor or crew the background colouration is lost. After completing all the assignments there is no priority colour, which makes it more difficult to find the high priori...
almost 4 years ago in IBM MAS - Scheduler 1 Not under consideration

Can't Create View in Baseline then Export to Excel

In order to export a custom set of attributes from DNG in Excel, you need to create and save a View. If the stream you do this from is a baseline, then you can't create the view. This is a serious problem as once you baseline something, you can on...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Out of the box "Prevent Editing" shall have an option to allow the addition of comments

1. We can use this precondition in much better way if it allows us to allow the addition of comments 2. Currently we need to achieve this via read only in status which requires alot of time to maintain specially in a scenario where we are adding a...
over 1 year ago in IBM Engineering - Workflow Management / Administration 3 Not under consideration

AM and QM links in local stream

We have enabled the GC for our project, in that case, we can only create the links between AM or QM with RM in the global configuration. Then we can't see any links information after we create a baseline in RM, it is not reasonable and should be c...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

Update Change Set Access

Change Sets can be modified by anyone in DNG. Typically, this is controlled in that only by sharing the URL to the Change Set can someone obtain access to a Change Set. However, if you link a Change Set to a RTC Work Ticket, any user can access th...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Epic - Solutions History

While closing a ticket the helpdesk engineer enters an adhoc solution. When user reopens the ticket and it moves through the normal process flow, the solution provided earlier is rewritten. If this is not an approved solution this is not saved any...
almost 4 years ago in IBM MAS - Maximo IT 5 Not under consideration

Anywhere 7.6.4 - Force Refresh of System Data

In Anywhere 7.6.4 once a device downloads system data it is not updated unless the user manually triggers a refresh. To do this refresh the user must log into Anywhere, go to Settings, select the three dots sub menu, and select Refresh System Data...
over 2 years ago in IBM MAS - Mobile 1 Not under consideration

RTC Web: Ability to lock the column header on the Query result screen

When we create a query and scroll down through the resulted work items in the query view, the headers can not be locked or kept shown.
about 5 years ago in IBM Engineering - Workflow Management / Planning 2 Not under consideration