Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 16 of 7030

Updating related records when linear asset lenght is changed

The linear asset could be connected to multiple records. For example, could be added on the Route, on the Preventive Maintenance, on the Work Orders ect. When the length of the linear asset (for example ENDMEASURE) is changed, the related record d...
almost 3 years ago in IBM MAS - Manage (Base) / Linear 1 Not under consideration

RQA - german translation

A German language must be available
over 4 years ago in IBM Engineering - Requirements Quality Assistant / Administration 1 Future consideration

RQA - automated tests when entering a requirement

An automated test whilst entering the requirement shall be possible. This helps and ease the usage and workflow. Currently the check is processed on demand (so if the user actively starts the check). It is much more usable to visualize a check for...
over 4 years ago in IBM Engineering - Requirements Quality Assistant / Administration 1 Future consideration

Run RQA on all requirement artifacts in a module

When using RQA to analyse quality of requirements, we have to manually select the artifacts to be analysed. This is limited to 200 artifacts at a time. For a module with many more than 200 artifacts, this is a huge pain.It would be preferred to se...
about 5 years ago in IBM Engineering - Requirements Quality Assistant / Usability 2 Planned for future release

RQA - Evaluate other attributes then the Object Text only

We would like to have a possibility to evaluate the text of different attributes than the "object text".
over 4 years ago in IBM Engineering - Requirements Quality Assistant / Administration 1 Future consideration

RQA - Selection of objects

At the moment it is only possible to select objects if you click on them. A possibility to filter for specific objects/ to select objects of a certain view would make that easier.
over 4 years ago in IBM Engineering - Requirements Quality Assistant / Administration 1 Future consideration

The Routes Path Selector will show a Route Stop with no descriptions or target location when the Path Selector is used to select a target location

If the Path Selector (Linear) is used to select a target location, you will receive an error message “BMXAA3616E – Select an asset or location for this route stop.”. It seems that the original design did not consider that a target location would b...
almost 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Condition Monitoring Work Order Generation should work the same way as it does for the Cron Task LinearMeasurementWoGenCronTask to eliminate the inconsistency

Maximo Linear allows you to record multiple Gauge or Characteristics meter readings (measurements or observations) taken over a short duration of time. Some of these meter readings may be over the action limits. When using the action Generate Work...
about 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Data Restriction Doesn't Effectively Applied to Linear Graphical View

Dear Sir/Madam, Our transportation client has different departments managing different type of assets, all base on same linear chainage. We set data restriction on different user groups to view different asset type, but linear graphical view fails...
over 3 years ago in IBM MAS - Manage (Base) / Linear 0 Not under consideration

RQA - change design of dialog-box

The dialog-box design shall be more user-friendly:a) The scrollbars must not be shown after starting the scriptb) The column-width shall be optimized (i.e. the first column "Identifier" and "Score" are too large showing senseless empty space!)
over 4 years ago in IBM Engineering - Requirements Quality Assistant / Administration 1 Future consideration