Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 7 of 7027

Introduce Qualification as the direct parameter for Optimization in the optimization templates

Introduce qualification as the direct parameter for Optimization in the optimization templates This will be helpful to run the scheduler optimization based on qualification, as a result the work order will be scheduled and assigned accordingly. Pl...
24 days ago in IBM MAS - Optimizer 1 Under review

Updating related records when linear asset lenght is changed

The linear asset could be connected to multiple records. For example, could be added on the Route, on the Preventive Maintenance, on the Work Orders ect. When the length of the linear asset (for example ENDMEASURE) is changed, the related record d...
almost 3 years ago in IBM MAS - Manage (Base) / Linear 1 Not under consideration

When running optimization throughout the day to support a dripfeed style of dispatching work, consider the crew or labor current location as input to assign work and minimize travel time

Ability to dispatch crews in a drip feed and give "best next job", using input variables at the time of the request (including crew position). We should use the labor or crew position from the LBSLOCATION table if optimization is run many times th...
about 1 year ago in IBM MAS - Optimizer 1 Functionality already exists

New Parameter to Keep the Same Resources Assigned to Work Order Assignments

When not using crews and only running one shift, having multiple people work on the same Work Order on different days is chaotic. I'd like to suggest a new "additional parameter" that can enforce keeping the same resources first assigned to a Work...
10 months ago in IBM MAS - Optimizer 1 Functionality already exists

The Routes Path Selector will show a Route Stop with no descriptions or target location when the Path Selector is used to select a target location

If the Path Selector (Linear) is used to select a target location, you will receive an error message “BMXAA3616E – Select an asset or location for this route stop.”. It seems that the original design did not consider that a target location would b...
almost 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Condition Monitoring Work Order Generation should work the same way as it does for the Cron Task LinearMeasurementWoGenCronTask to eliminate the inconsistency

Maximo Linear allows you to record multiple Gauge or Characteristics meter readings (measurements or observations) taken over a short duration of time. Some of these meter readings may be over the action limits. When using the action Generate Work...
about 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Data Restriction Doesn't Effectively Applied to Linear Graphical View

Dear Sir/Madam, Our transportation client has different departments managing different type of assets, all base on same linear chainage. We set data restriction on different user groups to view different asset type, but linear graphical view fails...
over 3 years ago in IBM MAS - Manage (Base) / Linear 0 Not under consideration