Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

Base Platform

Showing 54

Adding GHG protocol factors to managed factor sets

The GHG Protocol website has several factors published. It may be useful to include these factors as a managed factor set - clients may want to use these factors. This is the case especially for Kingspan, as they initially requested multiple facto...
28 days ago in IBM Envizi - ESG Suite / Base Platform 1 Not under consideration

Issues: Restrict data submission to 1 per time period

Restrict data submission to 1 per time period so that a data steward can only input 1 set of data points per time period so we cannot have overlapping data points
3 months ago in IBM Envizi - ESG Suite / Base Platform 3 Not under consideration

Issue Layout

Rearrange the data capture card layout to display KPIs first, followed by the time period, and then the reference/comment box for improved clarity and user flow.
3 months ago in IBM Envizi - ESG Suite / Base Platform 1 Not under consideration

PowerBI: Loading Icon

PowerBI loading icon is quite small right now so it is hard for users to see that the filter is being applied and hasn't completed it yet - so we need a clearing loading icon.
3 months ago in IBM Envizi - ESG Suite / Base Platform 1 Not under consideration

Expand the maximum number of characters allowed for text fields in accounts.

Some indicators require considerable space for users to explain the specific details of their performance. Therefore, the current 2,000-character limit seems insufficient, as it may lead to the loss of important information.
3 months ago in IBM Envizi - ESG Suite / Base Platform 7 Not under consideration

Reconfigure Relationship Between Accounts, Tag Types, and Tags in PowerReports

Currently, the relationship between accounts, tag types, and tags are configured in PowerReports in a way that doesn't make sense. When using a matrix or table visual with the account (Item Name) as a row header, if values are Tag Type or Tag, the...
4 months ago in IBM Envizi - ESG Suite / Base Platform 3 Not under consideration

Floor Area values to be used as the latest entry against a location when creating a kWh/m2 Ratio

We are attempting to track the energy usage of our locations, and compare similar building uses through a kWh per metre squared metric. We created a Ratio for this using Data Type Groups for kWh usage as the numerator, and floor area as the denomi...
5 months ago in IBM Envizi - ESG Suite / Base Platform 1 Not under consideration

Limit Dashboard Intensity Metrics to Relevant KPIs

While there are certain cases where I could see KPIs not part of the particular dashboard data type being relevant (e.g., Ratings, Floor Space), there are some that are clearly not useful in the context of certain dashboards (e.g., Natural Gas [kW...
5 months ago in IBM Envizi - ESG Suite / Base Platform 0 Not under consideration

PowerBi - Utilize Tags to filter in report

The client would like the following filters in the PowerBI. These exist as tags for the KPIs but are not pulled into the monthly data set to be used in PowerBI so cannot be filtered. The tags we have are: Internal/ External, framework/ standard, u...
5 months ago in IBM Envizi - ESG Suite / Base Platform 4 Not under consideration

Please remove the four decimal point limitation for input data.

Please remove the four decimal point limitation for input data. It can alter the calculation results which will not match with the original values.
5 months ago in IBM Envizi - ESG Suite / Base Platform 1 Not under consideration