Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5799

Return Room search Add-In Results in Batches

Problem Statement : When searching for rooms from large multi-floor buildings where there are 100+ rooms, it takes a while to load room results in Add-in. Proposed Solution : Take into account loading results in batches. Show a specified amount of...
over 2 years ago in IBM TRIRIGA Application Platform 1 Future consideration

ELM Doctor system analysis tool

We would like a feature added to create tool like another IBM tool that is client server based IBM l ClearCase tool called “ClearCase Doctor”. It would provide a systemic view of do you have the necessary minimal connections between servers and se...
about 1 year ago in IBM Engineering - Foundation/Common Services / Administration 0 Not under consideration

ISO 26262 Kit shall be certified for DOORS 9.7.x.

The ISO 26262 Kit is only certified for the DOORS 9.6 code stream https://www.ibm.com/support/pages/download-ibm-rational%C2%A0doors-safety-manual This shall be updated so DOORS 9.7 is also certified

Unload unit information should be stored in a file controlled by EWM

For increasing Rhapsody performance in big Rhapsody project, some units of the model were unloaded from the model so that they are persistently not loaded. Locally this works fine, but this information is not propagated via EWM to the entire proje...
over 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Functionality already exists

It takes a lot of time to open a work item with many Attributes.

Customer spend more than 20 seconds each time they open a work item. The attached screenshot is a HAR and ccm debug log when opening 3 different Workitem at intervals of about 1 minute. In this example, it takes about 20 seconds, but sometimes it ...
about 1 year ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Ability to see all records in the Location Hierarchy

Giving flexibility to see all location records in the location hierarchy without impacting performance, perhaps the ability to have pages instead of a list all that goes only to the first 1,000 records for example
about 6 years ago in IBM TRIRIGA Application Platform 36 Future consideration

30 Day rolling rules

BEPA rules for 30 day rolling profile - Changing the period for adopting the rules.
about 1 year ago in IBM Envizi - ESG Suite / Interval Meter Analytics 1 Not under consideration

Schedule rule changes

Ability to schedule rule changes in advance
about 1 year ago in IBM Envizi - ESG Suite / Interval Meter Analytics 1 Not under consideration

API Authentication

API Authentication should be OAUTH2 as per group requirements
about 1 year ago in IBM Envizi - ESG Suite / Base Platform 1 Not under consideration

Roll up interval data

Want to be able to roll up interval data to week/month on interval chart builder
about 1 year ago in IBM Envizi - ESG Suite / Interval Meter Analytics 2 Functionality already exists