Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5983

Restrict Workorder at planning level if there is a Permit requirement exists.

Workorder could not be able to move forward, if there is a requiment for Permit association (ex: If a Radiation or Fire Permit is required for workorder, system should not let the workorder to move forward to Inprogress), until Permit is associate...
over 1 year ago in IBM MAS - Nuclear 1 Functionality already exists

Rhapsody Model Manager Installers (Silent/Guided)

Currently, RMM users are required to manually install and configure Rhapsody, IBM Installation Manager, and the RTC Eclipse client in order to initially connect to a RMM project area. This process is long, detailed, and error-prone. Additionally, ...
over 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM 1 Future consideration

Document Update: destroy the reactive instance (delete should never be called directly)

Add "Call Destroy() method for destroying the reactive instance (delete should never be called directly)" to Code generation in Rhapsody documentation.This is already described at , but this is for C, not C++.
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Code and Execution 1 Future consideration

Saved Query public at site level

Saved Queries which are made pubic is visible by all user from all site. It should be at site level, which means if a saved query is made public, it should be visible from that perticular site.
about 11 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Better control and management of ongoing workorders in case of any delays.

To get better control and management on ongoing work orders in cases when works stop for some reason and to create a way to analyze WHY works stop at field. Currently WO tracking application does not have suitable functionalities for this purpose....
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Restrict the work order status change to Inprogress- without having a ready clearance (safety issue)

Safety in Maintenance/operations is of utmost importance in Nuclear indsutry. Having a Clearance ready with all tags applied- followed by work order execution would ensure safety in maintenance. ************************************ If a workorder ...
over 1 year ago in IBM MAS - Nuclear 1 Functionality already exists

Safety cross over from Locations to PM/WO

If a Location/ Asset is having safety associated (Hazards), they should be crossed over to transactional applications where the Location/Asset would be associated to. Ex: Location associated to PM, Location associated to Workorder.-- safety shoul...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Inspection form sort order

When I specify condition of questionnaire in Inspection form, at answer field selection displayed answer fields is not sorted by questionnaire orders which displayed inspection form definition. Please refer CASE Ticket #TS012408620
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Not under consideration

Enhancement request to have better document for Rhapsody AND VxWorks integrationn

For Rhapsody and Vxworks inntegration we have only the following document . https://www.ibm.com/docs/en/rhapsody/9.0.1?topic=eclipse-vxworks-workbench This is not a clear document if customer wants to integrate Vxworks with Rhapsody. Could we have...
about 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 1 Future consideration

Eliminate Redundant Mails for Work Items.

User want an email if someone tags user in a work item and want an email if someone modifies a work item that he own. But if someone tags user in a work item that he own receive 2 emails. So, User would like to receive only one notification for th...
over 1 year ago in IBM Engineering - Workflow Management 1 Not under consideration