Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5788

Add the ability for a supervisor to return the Inspection form to the inspector with comments upon reviewing the results and determining more information is needed

We added the ability to require a review of inspection results before they are completed. As a step 2 for this functionality, its requested to add a status indicating the form is being returned to the inspector after review for more input. We shou...
almost 2 years ago in IBM MAS - Mobile 0 Future consideration

Add the ability to see the Asset details from the Inspection

While performing an inspection, the inspector may need to see some asset details such as the specifications to check data such as the set points. There should be a way to view Asset details from the Inspection record.
almost 2 years ago in IBM MAS - Mobile 0 Future consideration

Maintain the hyperlinks included in a report when it is sent by email

Our client needs to schedule reports that contain hyperlinks. These hyperlinks are working fine when the report is executed using Immediate option, and let them jump to other report. When the report is scheduled and sent by email they hyperlinks a...
over 3 years ago in IBM MAS - Manage (Base) 0 Future consideration

Review Comment Filtering Improvements

The current requirement review interface is not great for responding to reviews. The following would be appreciated: 1) Add the ability to collapse different sections (for example, when responding to comments, it is not necessary to see a list of ...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Role based access to Visual Inspection data

In order to safely allow users to access appropriate data, we would like to be able to control user access MVI data on a more granular level than simply one user has total control of their data and no one but the admin and them can access it. Desi...
over 3 years ago in IBM MAS - Visual Inspection 1 Planned for future release

Create the ability to Disable or have a permission on using the Copy Workitem Function in a workitem.

It would be useful in managing clients who should or should not use the functionality.
6 months ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

EWM does not allow for pre-configured attributes which shall appear for the workitem copy function.

It would be useful to be able to customize which attributes get included in the list of attributes to choose from when you do a workitem copy. This would give the ability to limit or add attributes clients should or should not copy from previous.
6 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Remove restriction of Filters on string attribute values only consider the first 449 characters

Currently string type attributes are usable only for their first 449 characters, since anything over that limit cannot be used in filtering in UI. This is very confusing for users, imagine e.g. "Change History" attribute which will have quite many...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Improvement to Excel output from Publishing

In the Excel output generated from Publishing, the images are floating and the table will spread across multiple columns and rows. Thus the Excel export from Publishing is not really useful. It will be good if the images and tables from DNG (or ET...
6 months ago in IBM Engineering - Lifecycle Optimization Publishing / EDG 2 Future consideration

Restart add table process

As soon as even a tiny error occurs in the Add-Table process (migration from V605 to V701), the entire environment must be restored. Not being able to set up the Add-Table process means in detail: - Return to the V701 initial delivery state - Drop...
over 3 years ago in IBM Engineering - Foundation/Common Services / Installation 1 Future consideration