Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2816

Add V1 interface capabilities to V2

The V1 (IOT) interface in monitor offers enhanced capabilities to process messages. They are not all available in the V2 version in Monitor. But the V1 interface is to be abandonned.
about 1 year ago in IBM MAS - APM 0 Future consideration

Attachment between comments of a review and the review

Currently, comments and reviews are totally independent.Indeed, after a comment wrote during a review, it is possible to modify and delete the comment after the end of the review.
over 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 0 Future consideration

External Variable type/kind for Document Builder should allow other type then String

When defining external variable for RRDG we can refer to:https://jazz.net/wiki/bin/view/Main/RRCCustomRRDGReportsConfigurations I want the equivalent for Document Builder.Is there a way to have other format then String for the user to enter, like ...
7 months ago in IBM Engineering - Lifecycle Optimization Publishing 4 Future consideration

populate backlinks when creating links through a csv import

When performing csv work item imports that create links across repositories, only the link type specified in the file is created. The backlink is not created, and the only remedy is to perform a separate import specifically for those links.
over 4 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Enhancement request to support hidenui ARXML export

We want to implement a automation on a Jenkins server that includes the arxml export from a rhapsody model. But with command line switch -hiddenui it is not possible to perform the export. The tool always wants to show some dialogues. Steps to rep...
about 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / AUTOSAR 1 Future consideration

Allow user to select a Fit To property for PDF when scheduling a report so that reports with many columns will not be cut off on the right side

emailed PDFs will be cut off if the report contains a lot of columns, preventing users from seeing all of their data. We have users experiencing this issue in Maximo 7.6.1
about 1 year ago in IBM MAS - Manage (Base) 0 Future consideration

Non-responsive custom mappings

The implementation of the custom mapping page is not following adaptive (AWD) and responsive web design (RWD), which is a usability issue.The problem is shown in the attachment #1496.If the screen width is reduced, this is only possible to a fixed...
over 3 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration

Graphical Work Week and Graphical Assignment applications not respecting Include in Schedule? (WORKORDER.INCTASKSINSCHED)

We would like Graphical Work Week (GWW) and Graphical Assignment (GA) applications to optionally respect the "Include in Schedule?" (WORKORDER.INCTASKSINSCHED) flag as it does in Graphical Scheduling (GS) and Graphical Scheduling-Large Project (GS...
over 3 years ago in IBM MAS - Scheduler 2 Future consideration

Create some type of notification that informs the user that a data export limit has been set via the system property [webclient.maxdownloadrows] , so they are aware that there data may get truncated.

Setting the system property property [webclient.maxdownloadrows] helps prevent out of memory errors. However when set, the users are not aware of the limit. This presents a danger for analyzing data or trusting the dataset that is exported . For e...
about 1 year ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Linking Test Script Step Results to Requirement using Public APIs

We can link from Test Script Steps to Requirements. When execution, the Web UI shows the link from Test Script Step Result to requirement (as defined in the test script step). It is not possible to create those links manually or via any public API...
7 months ago in IBM Engineering - Test Management / Usability 0 Future consideration