Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 3019

To be able to make a code in a failure hierarchy Inactive.

There is no ability to modify the failure hierarchy after it has been used, you will receive the error BMXAA1159E - Failure list is referenced by a failure report and may not be deleted. There should be an option on a failure code that is part of ...
14 days ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

MAS Manage - Automatic Authentication to Cognos Analytics

Nowadays is required the user to connect first into Cognos Analytics application, keep the Cognos Analytics tab opened to run any Cognos report from any application. The idea is to Cognos works the same as Maximo 7.6.1.x where there is no need to ...
3 months ago in IBM MAS - Manage (Base) / Reporting 1 Future consideration

RM-DNG Change Set Merge Needs to be at the Attribute Level

The current DoorsNext configuration management Change Set merge process occurs at the Artifactlevel such that two Change Sets which modify the same Artifact but differentAttributes will show a conflict that has to be manually addressed. This reque...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

PM WOGen Log

The log that is generated when the PMWoGenCronTask runs is unusable. We have clients with tens of thousands of PMs and the log mentions all PMs that are not due, worse it counts this as an error whereas it should be a warning at best. I would like...
16 days ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Add option to assign several assignees, contributors (also allow for us to see who the contributors are) and reviewers per datapoint / question (not just per disclosure requirement)

For big companies, like ours, the topics and the information required by the datapoints cannot be covered by just one person, so it is necessary to have several assignees, contributors and reviewers per datapoint.
3 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 1 Future consideration

Add a similar property like Project::isSysML to packages

Problem description: The user shall also be able to work with SysML and UML profiles in parallel without impacting the other users by profile switches. Details: Currently the user needs to change the project type from "Project" to "SysML" whenever...
3 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 3 Future consideration

a direct, single-step link between a GC baseline and a CCM work item

We are using gcm configuration. The scenario is: We created baselines and review via workitem. We would like to know about whether the baseline was reviewed, the reviewers, the comments, the discussion log. Snapshot will contain all the tasks had ...
10 days ago in IBM Engineering - Workflow Management / Usability 1 Future consideration

Enable resize of picture embedded in test step description

We need a resize menu option in test step descriptions where the user can input x and y size of the picture - similar to the "manage image" button+menu already existing e.g. beside the menu "full size and thumbnail" with an additional option "cust...
about 1 month ago in IBM Engineering - Test Management / Usability 0 Future consideration

Enable customers to control the 2 digit year used in SimpleDateFormat

There are many date fields in Maximo, each of which go through a process to convert the string value into a date value using Java's SimpleDateFormat. This introduces sometimes undesirable behavior by the platform because the year field is a 2-digi...
3 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

European clients expects data input in esg framework to be multilanguage

Hi Felice, in our recent contacts with prospect clients, they have highlighted the importance to have an Italian official version of the 160 ESRS Framework questions and related data points. For all of them it would be a very significant feature r...
4 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 1 Future consideration