Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5653 of 5653

Allow user to sort the queries alphabetically.

Currently, for each application Maximo shows a list of queries on left side under Available Queries section, based on the value set for system property -mxe.webclient.maxNavbarQueryLimit. These queries displayed do not have any sort applied, also,...
almost 6 years ago in IBM MAS - Manage (Base) 4 Planned for future release

Reuse inputs and outputs in activity diagrams

In a activity diagram, when modelling with many CallOperation, Actions Pin, Activity Parameters and ObjectFlows, the diagram can be very messy due to the routing & overlapping of ObjectFlows. Since an input of an Operation is represented by an...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration

Request for the process of deploying classloader's .jar file directly in the server instead of using Tririga UI

Hi, We would like to know the list of steps that we need to perform on Tririga server to deploy the Class Loader's .jar file so that we can start using Class Loader's .jar file functionality in Tririga without manually uploading the file using Tri...
9 months ago in IBM TRIRIGA Application Platform 2 Future consideration

RQM API Publish

RQM API does not have the same level of fine grain control as RTC. RQM API is not published. The RTC OSLC API has allowed our company's developers to build solutions for Export Control capabilities, customize solutions for manipulating links betwe...
almost 6 years ago in IBM Engineering - Test Management / Integrations 5 Not under consideration

Add variable in work item template

In 7.0.2 EWM it's possible to create workitens using work item template. Today I can include two variables before creating the workitens (Filed Against and Planned For). The request here is to include as a third variable the Parent Link.
6 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Revise REORDER Calc for tighter control and take Lead Times into consideration.

There are companies ordering and maintaining stock with extra long lead times, and has considerably increased with the advent of COVID.
over 1 year ago in IBM MAS - Manage (Base) / Supply Chain 3 Future consideration

Maximo Does not Allow versioning of Item Warranty Contracts (Tr) and Asset Warranty Contracts (Tr)

Contracts and Purchase Orders in Maximo allow for revisioning. The Item Warranty Contracts (Tr) and Asset Warranty Contracts (Tr) do not have this ability.
almost 4 years ago in IBM MAS - Transportation 0 Planned for future release

Extend the Export - RS Export Reporting Image to ELO Pub to not only render charts but also render the RS formatted html tables

A user can investing in making the RS report perform and display how they want and by adding this extension it is an easy thing to input into PUB document without needing to re-format the data again giving the user complete control over how it ren...
3 months ago in IBM Engineering - Reporting / JRS 1 Not under consideration

IBM Tririga Platform 4.5.2 Issue with Enhanced_Render_Mode - Duplicate Tab Headers

We are seeing an issue when testing the new platform 4.5.2 with Enhanced_Render_Mode = ON where section headers are duplicating for the end users and causing confusion. It appears to be random when it happens, but has happened to multiple users wh...
6 months ago in IBM TRIRIGA Application Platform 1 Planned for future release

After adding JRS trend report to dashboard, allow to configure goal lines and date lines on dashboard

We are using JRS trend reports and would like to configure goal lines and date lines from dashboards using e.g. filters without going back to the JRS report to reconfigure these. But it seems that these lines do not get added as filters. For exam...
over 2 years ago in IBM Engineering - Reporting / Report Builder 1 Future consideration