Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2761

Maximo Health should have ability to URL link to Industry Solution (Health) versions of Locations and Assets applications

Job Statement As a reliability engineer, when I'm investigating the most critical assets or locations from within our outside of MAS, I need to be able to get quickly to Health Asset or Locations Page, so that I can assess whether those assets req...
about 1 year ago in IBM MAS - Health and Predict 1 Future consideration

Non-responsive custom mappings

The implementation of the custom mapping page is not following adaptive (AWD) and responsive web design (RWD), which is a usability issue.The problem is shown in the attachment #1496.If the screen width is reduced, this is only possible to a fixed...
over 3 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration

Attachment between comments of a review and the review

Currently, comments and reviews are totally independent.Indeed, after a comment wrote during a review, it is possible to modify and delete the comment after the end of the review.
over 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 0 Future consideration

Graphical Work Week and Graphical Assignment applications not respecting Include in Schedule? (WORKORDER.INCTASKSINSCHED)

We would like Graphical Work Week (GWW) and Graphical Assignment (GA) applications to optionally respect the "Include in Schedule?" (WORKORDER.INCTASKSINSCHED) flag as it does in Graphical Scheduling (GS) and Graphical Scheduling-Large Project (GS...
over 3 years ago in IBM MAS - Scheduler 2 Future consideration

DNG Link constrains should include external links

If you have a constrain other then ANY , you cannot use the "The Web" to create a link, You cannot correctly constrain linking if you require to link to The Web. In other word, to allow to The Web, means you allow to link to everything in the proj...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

PM Forecast Prompt on Closing Work Orders

For a PM using the completion date of the last work order to generate the next work order "Use Last Work Order's Start Date to Calculate Next Due Date?" is Unchecked. When the work order is completed the old forecasts remains. The user closing the...
7 months ago in IBM MAS - Manage (Base) 0 Future consideration

Maximo Mobile RBA - RBA does not support both QR Code and BAR Code scanning at once. Either it can use either BAR code or QR Code.

Maximo Mobile RBA - RBA does not support both QR Code and BAR Code scanning at once. Either it can use either BAR code or QR Code. But as per my understanding with IBM over support case, mobile app supports both scanning simultaneously. So it is b...
7 months ago in IBM MAS - Mobile 0 Future consideration

Make Artifact Type included by default in all RRDG reports

Most of my customers use the document export wizard from Modules. Most of my customers want to see Requirement IDs on Requirement artifact types only. OOTB, the way to do this is to customize the export in RPE to do a REST call for every single ar...
7 months ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

Use an editor representation that simply shows the hours or the unit which has been selected when entering the value, but no random combination of arbitrary, not well-defined units.

"Time Estimate" and "Time Spend" are represented in the work item editor in an awkward format. Even specified in hours, it's represented in "days" and "weeks" depending on the value of hours entered. But weeks and days are no precise units and for...
over 1 year ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

populate backlinks when creating links through a csv import

When performing csv work item imports that create links across repositories, only the link type specified in the file is created. The backlink is not created, and the only remedy is to perform a separate import specifically for those links.
over 4 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration