Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5983 of 5983

Embedded Multitab Support

In ICD, when any record is clicked in list tab, each record should be opened in new embedded tab or new browser tab so that user can view multiple records at the same time. In that way user can work with multiple records and increase their operati...
almost 3 years ago in IBM MAS - Manage (Base) 3 Not under consideration

SERVICEABILITY - SCADA Historian Connector

The SCADA Historian Connector product documentation and overall information currently available to customers is completely outdated and does not allow a customer to perform the required configuration successfully. Currently, the only avenue a cust...
7 months ago in IBM MAS - APM 0 Planned for future release

Don't show non-working hours in Graphical Scheduler

Don't show non-working hours in Graphical Scheduler in the assignment view.If you indicate in the calendar that a workday is from Monday to Friday and 8 hours per day, the outside working day's and hours are still indicated.
7 months ago in IBM MAS - Scheduler 0 Future consideration

Indicator for existing links of any kind

Having an indicator attribute that shows the existence of any link is much faster than checking the artifacts links section in the sidebar or creating a filter for any possible link. Also OSLC links to RMM and ETM and other external links shall be...
7 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Highlight or flag when a primary text is bigger than 32KB, to avoid issues when export to Microsoft excel format.

When user try to export a view of a module, that contains text bigger than 32KB, in excel format the tool gives the error: ID CRRRW8021E The content of primary text field must be less than 32 KB, in order to be exported. Edit the content of primar...
10 months ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Export 0 Future consideration

Usage of PUB scrips in RPE by scriptname and not by ID

If you are going to use javascript from PUB (assets --> scripts) in RPE the you can add a javascript with content similar to that: <Script src= "library://api/scripts/104"></Script>. Unfortunately you have to use the key instead of ...
almost 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Unassigned 6 Future consideration

Extended drilldown – add possibilty to configure classstructure into it / show tree of assets

Problem The extended drilldown is a good tool to get a hierarchical overview about data. But it has limited options to show information in tree do easily navigate & identify different data. Additionally, when extended drilldown is opened in ap...
7 months ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Not under consideration

Possibility of defining “Validated by” link constraints between ERM and ETM

See the screenshot "2024-07-09 12_34_01-Window.png". The QM Test Case 364 validate the RM artifacts 45130, 43907, 43390 and 43391 45130 is a "Heading" artifact 43907 is an "Information" artifact 43390 and 43391 are "Requirement" artifacts In our i...
7 months ago in IBM Engineering - Test Management / Administration 0 Future consideration

Maximo Does not Allow versioning of Item Warranty Contracts (Tr) and Asset Warranty Contracts (Tr)

Contracts and Purchase Orders in Maximo allow for revisioning. The Item Warranty Contracts (Tr) and Asset Warranty Contracts (Tr) do not have this ability.
about 4 years ago in IBM MAS - Transportation 0 Planned for future release

Reuse inputs and outputs in activity diagrams

In a activity diagram, when modelling with many CallOperation, Actions Pin, Activity Parameters and ObjectFlows, the diagram can be very messy due to the routing & overlapping of ObjectFlows. Since an input of an Operation is represented by an...
almost 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration