Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5835

Allow users to select more than one module view at a time

We use the shared view feature in DOORS Next to limit the number of attributes that are exported in a module. Described here in Step 5 https://www.ibm.com/docs/en/engineering-lifecycle-management-suite/lifecycle-management/7.0.2?topic=files-export...
3 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Future consideration

Market-based emissions report available in the set of CSV extract reports

Easier to consume the Market-based emissions data through the CSV extract mechanism
7 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

Live excel export from Report Builder - Remove the button "Make the results dynamic"

I export Doors Next data in excel using a report made with report builder and I choose "Download a spreadsheet with live data." After a test, it seems that the button "Make the results dynamic" and the button "Refresh Query results" located in the...
7 months ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Ability to remove the maximum characters reach pop up

We have a lot of custom fields that have maximum character set. For example account number which is 25 characters long on our case. Right now at 4.5 there a pop up warning saying that we have maximum characters reached. Where user have to click th...
10 months ago in IBM TRIRIGA Application Platform 1 Future consideration

links are not following the data model after change of artifact type

Observed behavior: I figured out that there is a link “Derived from” from a Requirement in one PA to an Information in another PA, which is not supported by the data model. (limited by a defined Linked Constraint) Steps to reproduce: Initially, th...
10 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

option to ignore Cobol sequence numbers on the SCM web UI

When comparing Cobol sources in the EWM SCM web UI in the browser, and sequence numbers were either removed or reordered between the compared versions, the comparison shows all the lines as being modified just because of these sequence number chan...
10 months ago in IBM Engineering - Workflow Management / Source Control 1 Not under consideration

Show Count of Filtered Records in Addition to Total Records in Scheduler Applications

When I filter the records in the table in the Scheduler applications, I would like to see a count of the number of records that meet the filter criteria. I can see the total record count loaded in the application, but once I filter this number doe...
over 3 years ago in IBM MAS - Scheduler 2 Future consideration

Allow duration to be modified in Graphical Work Week using inline editing

It is common for a supervisor to adjust duration when assigning work. Right now the only options are to drag the bar which only drags in 1 hour increments or update the End Date. It would be a huge usability improvement to allow duration to be upd...
over 2 years ago in IBM MAS - Scheduler 1 Future consideration

Sorting the column order by drag&drop

Inside the several views in DNG (module view, collection view or just folder view) it should be possible to reorder the columns that are displayed by using drag&drop and not only order them inside the "change column display settings".
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

IBM Maximo Connector for SAP needs to support Cloud Platform Integration (CPI).

This is a must have requirement for our Maximo customers. IBM Maximo Connector for SAP needs to support Cloud Platform Integration (CPI). CPI is SAP’s cloud-based middleware that allows integration between cloud and on-premise applications with th...
7 months ago in IBM MAS - Manage (Base) / Integration 0 Planned for future release