Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2957

Cloud Pak 4 Sustainability

We offer sustainability software in parts, why not offer it in one PID. The package could include Turbonomic, Maximo, Tririga, and Envizi Suite. This way customers don't have to rely on different IBM resources to assist with a cohesive function.
over 1 year ago in IBM TRIRIGA Energy & Environmental Sustainability Management 1 Future consideration

Warn user when importing from spreadsheet to ERM when an attribute on the spreadsheet doesn't exist for artifact type

When importing a spreadsheet into RM which included a custom attribute type, the import finished successfully yet the custom field was not populated. I determined that the custom attribute was not attached to the artifact type, therefore the impor...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Allow to create and save multiple Layout and Filters with capability to import and export them to Share with users.

In all Graphical Application with Graphical View, allow users to create and save multiple Layout and Filters with capability to import and export them to share with others when needed.
over 2 years ago in IBM MAS - Scheduler 1 Future consideration

Possibility to group the added artifacts and assign to different reviewers

Currently, it is not possible to group the added artifacts and assign to different reviewers.In DNG review, we can add artifacts and participants. There is no way to group the added artifacts and assign subset of the added artifacts to different r...
8 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Automatic email notification to the reviewers on nearing the "due date"

This will help the reviewer to complete the review on time.
8 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Correct BUG in plan view grouping display

See support case: TS015919692 Summary of problem here: - In a plan view I'm trying to 'Group By' a custom attribute. - However, this displays the groups in reverse alphabetical order. - As you can see in the Eclipse window to the right, the Enumer...
8 months ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Disable button for merge configuration for selectable user groups

In merge configuration the user can accidently merge all testcases (button currently visible) instead of merge selected testcases (button currently invisible). To avoid this misuse, the button should be disabled for selectable user groups.
over 1 year ago in IBM Engineering - Test Management / Usability 0 Future consideration

Maximo Health should have ability to URL link to Industry Solution (Health) versions of Locations and Assets applications

Job Statement As a reliability engineer, when I'm investigating the most critical assets or locations from within our outside of MAS, I need to be able to get quickly to Health Asset or Locations Page, so that I can assess whether those assets req...
over 1 year ago in IBM MAS - APM 1 Future consideration

The Views REST API schema should provide the name of the view

When running a views query, such as: https://localhost:9443/rm/publish/views?moduleURI=MD_C5RPsDCaEe6U3JRBauIIQg&viewURI=VW_z2cogA1KEe-HB6PRUNr6hQ&projectURI=_e8cRECGoEe6W8LVdNRSkvA The return data include information about the module but ...
8 months ago in IBM Engineering - Requirements Management DOORS Next / Unassigned 0 Future consideration

Managing automatic links in work items fields

LinkDetector process let any string in work items containing keywords like 'defect 1234' or 'story 5678' to become a link towards dedicated work item. This can really be a very annoying feature when reference is unvolontary or is outside RTC perim...
almost 5 years ago in IBM Engineering - Workflow Management / Work Items 4 Future consideration