Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5825

Power Report - Partner Functionality Improvements

ISS add value to customers in loading, managing and quality checking customer data and reporting on energy management with valued insight and then acting on those insights to reduce customer energy consumption. Our use of Envizi hinges on our abil...
over 1 year ago in IBM Envizi - ESG Suite / Base Platform 1 Future consideration

Many times, I get the id of a work item and I need to go track down which plan it is in. It would be nice to have a history of all the plans that a work item is included in, attached to, etc.

When I'm analyzing work items linked to requirements I need to get to the plan or plans that the work item are part of without having to go dig around to find the info. It would be nice to have the plan as some sort of link on the work item as wel...
4 months ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

Issues and Transfers (RBA) - Charge information on work order and task need lookups

In the Charge Details of an Inventory Usage line the work order and task should have a lookup. This could be limited to the set of work orders which have been downloaded to the device when offline, it is likely that when creating an inventory usag...
4 months ago in IBM MAS - Mobile 0 Future consideration

Issues and Transfers (RBA) - Inventory Usage Records should have filter and sort options

If there are a lot of inventory usage records then finding the right one is difficult unless the description contains the information. There should at a minimum be the ability to filter on the inventory usage lines by work order, material requisit...
4 months ago in IBM MAS - Mobile 0 Planned for future release

DNG Template handling and distribution

We define the standard development process and methods for the entire development part (~6000) developers. Since the artefact types and the attributes are part of the information model, those are tight to the process and method releases. There are...
4 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Move one project from one server to another

So mostly you are starting with a specific set of server. After some time you recognize that it is too small and you are creating new server. So currently it is only possible to add new projects to the new servers. But sometimes it makes sense to ...
4 months ago in IBM Engineering - Foundation/Common Services / Usability 1 Not under consideration

Request to add an option to associate change requests with combined changesets in the EWM client

Currently, there is no option to associate change requests with combined change sets in the EWM Client. When we try to combine change sets in the EWM Client (AEEE), the default option is to associate a work item, not a change request. We would lik...
4 months ago in IBM Engineering - Workflow Management / Source Control 1 Not under consideration

Forget Login ID? feature in MAS Manage Login screen

IF the user forgets the login id, there should be a way to retrieve it using the primary email id by clicking on Forget Login Id? There is a support ticket raised TS015499059 for Forget Password which is updated as the reference ticket, this featu...
8 months ago in IBM MAS - Common Services 0 Planned for future release

In Graphical Work Week, it would be useful if the hovering on the assignment bar displayed other data in addition the full WO or Task description.

In the Gantt View, hovering over an assignment bar displays the full Work Order or Task description. It would be useful have a hover dialog similar to fields such as WORKORDER.ASSETNUM or WORKORDER.PARENT that have a small circle i on the Work Ord...
almost 3 years ago in IBM MAS - Scheduler 1 Future consideration

Provide an Editable Field for Failure Date and Time on Failure reporting under Report Work Page for My Schedule App

When reporting failure for a Work Order and adding the Failure Class followed by Problem, the Failure Date and time is auto-populated. On Maximo Classic this field is editable so user can report failure that occurred in the past. But on Maximo Mob...
about 1 year ago in IBM MAS - Mobile 1 Future consideration