Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5836 of 5836

Move one project from one server to another

So mostly you are starting with a specific set of server. After some time you recognize that it is too small and you are creating new server. So currently it is only possible to add new projects to the new servers. But sometimes it makes sense to ...
4 months ago in IBM Engineering - Foundation/Common Services / Usability 1 Not under consideration

Request to add an option to associate change requests with combined changesets in the EWM client

Currently, there is no option to associate change requests with combined change sets in the EWM Client. When we try to combine change sets in the EWM Client (AEEE), the default option is to associate a work item, not a change request. We would lik...
4 months ago in IBM Engineering - Workflow Management / Source Control 1 Not under consideration

Saved Layouts

Users need the ability to have multiple user specific layouts saved so that they don't have to reconfigure the columns every time for Graphical Scheduling applications
about 3 years ago in IBM MAS - Scheduler 3 Future consideration

Show correct "Tested By" user in Test Case Result when running an Automated Test Case

When running an automated Test Case (such as UFT, for example), the "Tested By" section that exists in the Test Case Result will show the user who is registered in the Adapter, instead of the user who is running the test. This information is misle...
over 1 year ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Extended Formula Queue

Our Extended Formula Queue gets stuck, continues to grow and the only solution is for IT staff to manually Stop/Start the EF Queue Agent.
over 4 years ago in IBM TRIRIGA Application Platform 3 Future consideration

DOORS Server badly needs a rollback / undo feature for failed transactions beyond the backup/current/new data file concept currently in use

The connection between DOORS Client and DOORS Server is prone to outages by the nature of its design. DOORS Clients contain most of the application logic, DOORS server has the storage abilities. The transfer of new / edited / processed data betwee...
about 1 year ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Server 0 Future consideration

Add means to update / modify baseline access controls in limited scenarios.

Static / frozen Access Control Lists block baselines from being accessed on different - or same but evolved, databases, where users and groups differ / have changed. This is especially an issue when a module with baselines is restored from an arch...
about 1 year ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Baselines 0 Future consideration

Warranty Claims Processing Needs Flexibility and Enhancements

In the Transportation Industry, warranty claims can generate a significant portion of operational cost coverage from Manufacturers. Annually this can total upwards of $5 to $10 million and thus it is important that the contracts with these Manufac...
over 2 years ago in IBM MAS - Transportation 2 Future consideration

API supported for downstream integration

TRIRIGA should support OAUTH for webservices downstream integration.
over 5 years ago in IBM TRIRIGA Application Platform 2 Future consideration

Data uploaded through bulk upload shows as System User for updated by column instead of actual user name who made the real updates.

Whenever file is uploaded directly in the Envizi portal, system is unable to capture the Updated By details. User details needs to be included instead of “System User” in case of web upload irrespective of the internal/external facility used for b...
9 months ago in IBM Envizi - ESG Suite 1 Future consideration