Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5757

CTI Integration for IBM Control Desk

In earlier IBM Control Desk releases there was a CTI integration with Genesys and potentially also with CISCO. The corresponding CTI plugin is still deployed together with the optional content for ICD. Nevertheless the Genesys SDK that is required...
over 4 years ago in IBM MAS - Maximo IT 0 Not under consideration

Enhancement to jobs API of RPENG to have more meta information

Currently the /api/jobs API gives information of all the jobs along with the job results of each job.As of today, there is no information about the connection details and template details along with the template variables that can be identified fr...
almost 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Documentation Builder 3 Not under consideration

Button or feature to insert attachment file link into RTC work item HTML rich text editor

Currently, the HTML editor allows you to insert the below link types:* Links* User links* Work item links In addition to these, we would like to request a feature to insert links to attached files of the same work item. Presently, you need to manu...
over 4 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Local RMM Queries

Service Case# TS001191067Design Manager had possibilities of building local queries. The successor RMM should also support local query capabilities.
about 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 1 Future consideration

Bulletin Board during Package Manager

Currently Maximo 7613 create BB for every time Maximo Package Migration with subject "Migration Manager package deployment is in progress.". It could for 1 minute or longer. Suggestion: Add a system property to indicate if a bulletin board message...
4 months ago in IBM MAS - Manage (Base) 0 Not under consideration

The ability to perform labor entries and labor reporting in Mobile

Labor reporting is critical for us to ensure we have the resources we need to provide service. Currently, our team can add labor to work records, but cannot add labor entries in mobile. This means they have to go back to a computer by days end and...
4 months ago in IBM MAS - Mobile 0 Planned for future release

Ability to batch update of the LOCATION Custodian (like it's enabled on Assets)

Preface Sund & Bælt operates large civil infrastructures like bridges, harbors, rail corridors, road corridors and landworks. Having thousands and thousands of assets and locations, Sund & Bælt has taken this approach to work with assets a...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Process templates have no any migration routine on upgrade or importing from previous releases

We have migration routing through extension points to manage permission and other process template settings during a server upgrade. But this is only for project areas, there is nothing similar for process templates when server is being migrated. ...
4 months ago in IBM Engineering - Foundation/Common Services / Performance 1 Not under consideration

Export/Import process templates on different versions does not preserve permission structure for user roles.

There is a related workitem from foundation as the manage of process template source is on their side: 494200: Process templates have no any migration routine on upgrade or importing from previous releases. Once they complete this enhancement we m...
4 months ago in IBM Engineering - Foundation/Common Services / Performance 1 Not under consideration

MAS Manage - BIRT Report with multi page output should come in single sheet on xlsx file

As part of the BIRT Export Report functionality in Maximo, on selecting the Report format as xlsx the data is splitting into different tabs on the excel sheet based on the number of pages of the Report. The Requirement from the Client is to have a...
9 months ago in IBM MAS - Manage (Base) / Reporting 1 Future consideration