Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2952

Transfer changes of artifacts performed in a process conform way (i.e., not violating any preconditions) to a child stream.

Description: Currently, the Preconditions & Follow-up Actions (especially: “Disallow Saving of Test Cases with State Approved or Retired”) prevents to transfer changes of an artifact from a parent to a child stream, although the changes where ...
over 1 year ago in IBM Engineering - Test Management / Usability 0 Future consideration

Possibility to restore deleted modules and artifacts

Not possible to restore deleted Modules and artifatcs.Modules must be restored manually.Artifacts cannot be restored at all. Use Case: Users delete artefacts, which are available in older baselines. It is frustrating for them, if they need to re-c...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

PM Forecast Prompt on Closing Work Orders

For a PM using the completion date of the last work order to generate the next work order "Use Last Work Order's Start Date to Calculate Next Due Date?" is Unchecked. When the work order is completed the old forecasts remains. The user closing the...
10 months ago in IBM MAS - Manage (Base) 0 Future consideration

Maximo Mobile RBA - RBA does not support both QR Code and BAR Code scanning at once. Either it can use either BAR code or QR Code.

Maximo Mobile RBA - RBA does not support both QR Code and BAR Code scanning at once. Either it can use either BAR code or QR Code. But as per my understanding with IBM over support case, mobile app supports both scanning simultaneously. So it is b...
10 months ago in IBM MAS - Mobile 0 Future consideration

Make Artifact Type included by default in all RRDG reports

Most of my customers use the document export wizard from Modules. Most of my customers want to see Requirement IDs on Requirement artifact types only. OOTB, the way to do this is to customize the export in RPE to do a REST call for every single ar...
10 months ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

The Rhapsody CSV Importer should import values where appropriate

When using the CSV importer, values in the CSV are ignored; they do not populate the Initial Value field, nor are values imported for Enumeration Literals.
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 3 Future consideration

Display Settings -> Displaying of attributes from linked artifacts: Limit selection list to attributes relevant for the artifact type

Current situation in Display Settings:When a link type is selected and attributes for this link type shall be displayed, the drop down selection list provides all attributes which are configured in DNX, even if they are not relevant for the specif...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Allow displaying of attributes from linked artifacts from other ELM applications

Feature Request: Allow displaying of attributes from linked artifacts from other ELM applicationsThis feature already is available for DNX internal links. For example see attached screenshots. Usecase for displaying attributes in DNX from associat...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Space Assessment: Verify during space assessment for assets and people

During a space assessment (audit), the assessor requires the ability to validate/verify each asset and people record. Functionality is required that is similar to how the floor plan updates after clicking the existing Verify button. Today, the flo...
about 3 years ago in IBM TRIRIGA Space Management 0 Future consideration

Space Assessment: Ability to enable/disable layers on the assessment floor plan view.

When using Space Assessment, customer require the ablity to enable/disable layers on the assessment floor plan view.
about 3 years ago in IBM TRIRIGA Space Management 3 Future consideration