Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2959

TrsValidation using URIAliasing for cross-server communication

TrsValidation isn't using URIAliasing for cross-server communication so we want to implement the idea to change this so that TRSValidation will use URIAliasing.
3 months ago in IBM Engineering - Foundation/Common Services / Performance 2 Future consideration

Consider Resource / Crew Assignment when control the Resource load and Availability in Graphical Scheduling

How it works today During the Planning/Scheduling phase, Graphical Scheduling is used to decide whether work orders can be executed based on resource and crew availability. The Graphical Scheduling calculates availability by dealing with Calendar/...
9 months ago in IBM MAS - Scheduler 1 Future consideration

Need to be able to set Logger configuration back to default

In the Logger configuration we can change the logging level of each logger. After having done the debug, it would useful to reset all the changes back the default/original setting. Should have a button on the top to reset.
8 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Scheduler – Graphical Work Week - Remove the start date filled automatically.

The Scheduler has Work order's in his scope of work that does not have planning dates because it is not a priority. The scheduler wishes to identify them to populate his planning. The scheduler wishes that the schedule dates are not automatically ...
about 4 years ago in IBM MAS - Scheduler 6 Future consideration

Dashboard feature required

We have created a dashboard with master project area using scrum template, can this dashboard be inherited to the child project areas?
5 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Export report to XLSX as single table/sheet

Currently, when exporting a report to XLSX, the data gets split into multiple sheets. It would be helpful if there were an option to export to XLSX where the data is all in a single table/sheet. We understand why .pdf format was designed to retain...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 2 Future consideration

Avoid Read access to a folder and to a module to some members

In DOORS Next, everyone declared at PA or TA level has a read access to every artifacts in a Project Area. DOORS Next offers to assign ownership to a Team for a folder or at module level. This means read-write access. BUT other members (at PA leve...
9 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Suggest to the Rhapsody user that they should update the unit if they attempt to lock a unit that is not up to date

When a user locks a unit, Rhapsody is not forcing (or suggesting) the user to first update their model before locking. Many people are locking without updating the model, and this leads to conflicts because they are making updates on an older vers...
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Object Structures should allow a Source Object multiple times

Object Structures need to allow a given Object to appear as a Source Object multiple times. For example, we may want to include the full name, department, primary email address and primary phone number for the Lead, Owner and Supervisor of a Work ...
over 5 years ago in IBM MAS - Manage (Base) / Integration 1 Future consideration

in modules prevent base artifact linking via project admin setting

In the system engineering all customers working in DNG with in the module mode. The default requirement engineer works inside a module and is not aware of the background settings in DNG, eg the artifacts are stored in a module folder and there is ...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 3 Future consideration