Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5759

Display in vector image in DM/RMM

In DM, when a diagram is exported, it is a .png image.
over 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 1 Future consideration

Enable Admins to broadcast messages across the system to users

When we have a scheduled outage, as an admin I have to create an email and copy the email addresses of users that are currently logged into the system onto the To: line. Then I have to keep checking to see if the list of users changes up to the po...
over 1 year ago in IBM TRIRIGA Application Platform 1 Future consideration

Inspection Form Question Grouping - Delete should not remove Inspection Questions

When inspection questions need to be removed from Inspection Question Groups the only current option is to drag and drop the inspection question out of the group and then delete the group. In the situation where I want to remove a group which has ...
about 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Planned for future release

Work Order indicator that a lease/rental contract exists for the asset

When you are planning work or about to work on an asset, you should know whether the asset belongs to an active lease/rental contract, or there is a warranty/service contract, there is already a field to indicate that a warranty exists. You can th...
5 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Assets application to show that an asset is part of an active lease/rental contract

Assets are leased and rented, and you need a visual indicator to know that you should look up the contract details to determine whether you are allowed to perform maintenance (or not), perhaps review properties or terms and conditions. From the As...
5 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Reviews Versioning

DNG Reviews needs to have versioning capability. A review goes through comments from reviewers, and if change is made to the artifacts under review to address the comments, a new review revision should be instantiated. Ability to version the revie...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

XML Import/Export permission on Team Area Level

Team area is an unique and extremely useful concept use in ETM. Project Admins are able to restrict data visibility using the roles and permissions in Team Areas because for Team area level permissions.Team area level permissions are almost same a...
over 1 year ago in IBM Engineering - Test Management / Administration 0 Future consideration

VET Indicate areas that each of the coreapi PODs handles e.g. POD1 handles MAS Mobile / POD2 handles MIF

The core MAS project includes three "coreapi" pods. Research shows that the some transactions (e.g. MAS Mobile) are being handled by the same POD. we would like to see more information about how to identify which POD is likely to handle particular...
over 2 years ago in IBM MAS - Common Services 1 Not under consideration

DOORS Next should give the possibility to easily switch to existing open Change Set

Hello, Use-case: the user is using GC configuration or LC configuration and wants to update a DN artifact Expectation: if there is already an open Change set (info already available as warning), there should be also the option to switch to the exi...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Allow adding more than 10000 artifacts per module

Current situation: DNX 7.0.2 has the limitation of maximum 10000 artifacts per module. Use Case: We are receiving from our stakeholders modules containing more the 10000 artifacts and we have trouble importing them in DNX. Expected situation: remo...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration