Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Test Management

Showing 513

OSLC Cleaner Utility needs adoption of OIDC application passwords for native ELM clients

Customers using Jazz Authorization Server with e.g. SAML back end use application passwords to log in to non-Web clients. In a command such as the below, customers wish to use application password instead of traditional password. They already do t...
12 months ago in IBM Engineering - Test Management / Integrations 0 Future consideration

Test script of RIT script - suggest that the generated RIT script link can be editable

We just finished a round of web service testing. We have RQM integrated with RIT. It works well, but there was still something confused me. When export and RIT script to RQM, an RIT automation test script is created in RQM automatically. There is ...
12 months ago in IBM Engineering - Test Management 1 Future consideration

Bulk lock and unlock test artifacts with e-Signature in RQM

Users in RQM/ETM need to be able to bulk lock and bulk unlock test artifacts (test scripts, test cases, test suites, test plans) with e-Signature enabled. The current auto-lock/unlock workarounds tied to the RQM workflow states are not sufficient ...
almost 5 years ago in IBM Engineering - Test Management / Usability 4 Not under consideration

JRS-LQE report continues to show previous expected result content for Information Step

For a report on a test plan developed for our clients, we noticed an anomaly regarding data from an information step. On our environment, the information step stting is configured not to display "Expected Result" or related requirements. But, if t...
12 months ago in IBM Engineering - Test Management / Reporting 0 Future consideration

RQM: Can not filter on IDs in test case section.

In at testplan testcase section it is not possible to filter on a list or range of ID numbers. Eg 6,8,12, 17-21 etc
almost 8 years ago in IBM Engineering - Test Management / Usability 2 Not under consideration

Limit for max number of test steps in a Test Suite

It should be possible for an administrator to configure max number of test steps in a Test Suite and/or in a Test Case. Currently users can create complex Test Cases with hundreds or thousands of manual test steps. This leads to 504 Gateway Time-o...
almost 2 years ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Test Suite Execution Result Should list the event details when result is changed by user ADMIN ( System Generated Role) with a message in TSEResult

When scheduling a manual execution for the Test Suite by selecting the schedule check box. And execution is not completed( it is left in Progress) and let the session expire Test Suite Result changes the result by ADMIN ( System User)>> A we...
almost 2 years ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Enhancement of OSLC API: allow including attachments in test case results

Good evening, We have noticed that when we consult the information of a Test Case Result of “Scriptless Result” type, the xml generated using OSLC API and the xml generated using the Reportable REST API have different information. In order to alig...
12 months ago in IBM Engineering - Test Management / Integrations 0 Future consideration

In ETM the SCM linked field is called Related files in a Test Case but Linked files in search query.

Current behavior: In ETM the field that shadows the linked files from EWM SCM is called "Related files" inside a Test Case, but in the view of all Test Cases it is called “Linked files”. Requested change: The naming convention should be consistent...
about 1 year ago in IBM Engineering - Test Management / Usability 0 Future consideration

Filtering for EWM CCM related files and linked work items not possible in ETM

Current behavior: In an ETM query you have the columns "Linked files" and “Tests Development Items” visible, but you do not have any option to filter for it, so there is no possibility to search for artefacts with linked/related files or work item...
about 1 year ago in IBM Engineering - Test Management / Usability 0 Future consideration