Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5992 of 5992

Add the ability for a supervisor to return the Inspection form to the inspector with comments upon reviewing the results and determining more information is needed

We added the ability to require a review of inspection results before they are completed. As a step 2 for this functionality, its requested to add a status indicating the form is being returned to the inspector after review for more input. We shou...
about 2 years ago in IBM MAS - Mobile 0 Future consideration

Add the ability to see the Asset details from the Inspection

While performing an inspection, the inspector may need to see some asset details such as the specifications to check data such as the set points. There should be a way to view Asset details from the Inspection record.
about 2 years ago in IBM MAS - Mobile 0 Future consideration

Allow more flexibility when creating a tailored SRM report

When creating a tailored SRM report (for example for an internal monthly report) allow the user to: -link existing power reports to the answers of questions - export pdf extract of complete report automatically and send it to specific contacts - s...
6 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 2 Future consideration

Support FMI 2.0

Currently just FMI 1.0 is supported by Rhapsody. We get from our customers models with FMI 2.0. So it would be great to upgrade the interface to 2.0, so that we can import also those models.
6 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 1 Future consideration

Audit Reports - Knowledge Base content request

There is only 1 article on the Knowledge base describing Audit Reports - Factor Audit and Review. These are becoming increasingly more asked about by prospects and clients. There are at least 6 Audit reports on 'All reports' in the Envizi demo sit...
6 months ago in IBM Envizi - ESG Suite / Base Platform 1 Future consideration

Unable to open the Follow-up work orders created from Technician application in the mobile device unless explicitly refreshing the Mobile list view page using "Check for Updates" option.

In the Maximo Mobile Technician application, when a user creates a Follow-up work order for a work order in the mobile device, the user must always navigate back to the list view of the originating work orders and refresh the page using the "Check...
6 months ago in IBM MAS - Mobile 1 Functionality already exists

The group and users to be case adherent in Manage

By default Security groups from LDAP/Active Directory are added as lowercase group name in MAS is by design. Due to this, it will always be passed to Manage in lowercase even though they are in uppercase in LDAP/Active Directory. Which is causing ...
over 1 year ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Planned for future release

Add ability to edit attached PDFs directly from IBM Maximo Mobile EAM

Add the ability to edit a PDF attachment when it is opened in IBM Maximo Mobile EAM and have the edited attachment sent back to Maximo as a transaction (i.e. thus updating the attachment on the record). This would be beneficial for any PDF checkli...
over 1 year ago in IBM MAS - Mobile 1 Not under consideration

Review Comment Filtering Improvements

The current requirement review interface is not great for responding to reviews. The following would be appreciated: 1) Add the ability to collapse different sections (for example, when responding to comments, it is not necessary to see a list of ...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Gantt Chart Advanced Controls

Enable controls that determine which lines in the Gantt chart can be modified by the planner. An example. If Maximo creates a regulatory work order (worktype - Regulatory PM) we would not want someone moving that dates of those jobs. If the work o...
over 2 years ago in IBM MAS - Scheduler 1 Future consideration