Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5965

Extend the Export - RS Export Reporting Image to ELO Pub to not only render charts but also render the RS formatted html tables

A user can investing in making the RS report perform and display how they want and by adding this extension it is an easy thing to input into PUB document without needing to re-format the data again giving the user complete control over how it ren...
6 months ago in IBM Engineering - Reporting / JRS 1 Not under consideration

Import role permissions

Currently you need to click through the role permissions. The list is very long and you need to differentiate between the role permissions in project area and team area.It would be more efficient, if the role permission information can be uploaded...
over 4 years ago in IBM Engineering - Foundation/Common Services / Unassigned 1 Future consideration

When both Monitor and Manage are used, give me an easier way to inherit dimensions from Manage for devices instead of manually defining dimensions and associating them.

In Maximo Manage, I specify information about assets such as Classification, Classification Attributes, Asset Type, etc. I should be able to use this information to inherit dimensions about the sensor device attached to an asset instead of manuall...
over 1 year ago in IBM MAS - APM 0 Future consideration

Allow devices that are attached to assets to be published as part of the Asset hierarchy from Maximo Manage to Maximo Monitor

Devices such as sensors are attached to assets. Many customers track these OT devices as assets within Maximo Manage. These devices are usually tracked as a child asset attached to a parent as a sub assembly. We should provide the option to publis...
over 1 year ago in IBM MAS - APM 0 Future consideration

Ability to merge Test scripts from within Test case in RQM

Problem Statement: Ability to merge Test scripts from within Test case in RQM Teams Affected: All Teams in Onshore Project area Application version: 6.0.6.1 ifix019 Priority: High Problem: While merging, the test case changes and test script chang...
about 3 years ago in IBM Engineering - Test Management 1 Not under consideration

Merge fails if the test case is already approved in the target stream

Problem Statement: Merge fails if the test case is already approved in the target stream Teams Affected: All Teams in Onshore Project area Application version: 6.0.6.1 ifix019 Priority: High Description: One of our team is using a two-stream strat...
about 3 years ago in IBM Engineering - Test Management 2 Not under consideration

Maximo mxe.ltpatoken.timeout needs to be able to retrospectively delete records in the LTPATOKEN table

Currently, the code does not cater for retrospective deletions of the LTPATOKEN table should an event occur that stops the process set via the mxe.ltpatoken.timeout. If data is present before the timeout date is not get deleted. This can lead to a...
over 3 years ago in IBM MAS - Manage (Base) 0 Future consideration

Technician (RBA) - Difficult to enter future Schedule Dates when creating a new work order - remove the schedule finish it is superfluous.

There is a problem asking for both Schedule Start and Schedule Finish dates when creating a new work order in the Technician application because date fields get defaulted which means that if you change the Schedule Start to a future date/time you ...
6 months ago in IBM MAS - Mobile 0 Future consideration

DiffMerge tool reports update

DiffMerge tool reports shall be able to generate reports containing color coded messages showing the differences. The colors are mentioned at the begining of the document, but it seems that they are not used
6 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Documentation 1 Future consideration

Need possbility to link a Report with other ELM artifacts e.g. EWM Work Items

There shall be the possibility to link a report with an ELM Artifact. The report should be bi-directional. For EWM a related link or a resolves/resolved by!link is sufficient. Use-case: - link a development plan item e.g. Feature with the report w...
over 1 year ago in IBM Engineering - Reporting / Report Builder 1 Future consideration