Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 6003

WOBYASSET/WOBYLOCATION relationship performance improvement

Currently Mobile uses the above relationships to get the last X number of completed/closed WOs based on the asset/location on the WO. The Mobile datasource adds in some criteria around status in COMP/CLOSE, however the Manage relationship also spe...
1 day ago in IBM MAS - Mobile 0 Submitted

Provide Excel output when using a PUB (RPE) report in EWM

Currently, when we want to generate a document based on a RPE canevas that has been deployed in an EWM ressource, the only available outputs are PDF, Word, HTML, and XSL-FO. It would be very helpful to be able to choose the Excel output, as we can...

Provide Excel output when using a PUB (RPE) report in ETM

Currently, when we want to generate a document based on a RPE canevas that has been deployed in an ETM ressource, the only available outputs are PDF, Word, HTML, and XSL-FO. It would be very helpful to be able to choose the Excel output, as we can...
1 day ago in IBM Engineering - Test Management / Reporting 0 Submitted

Provide an excel template file option in the Excel output of PUB Launcher

When using the Word output, it is possible to provide a stylesheet that already contains contents. It would be very helpful to have the same feature in the Excel output. Being able to provide an excel file that already contains contents will offer...

Provide Excel output when using a PUB (RPE) report in DOORS Next

Currently, when we want to generate a document based on a RPE canevas that has been deployed in DOORS Next, the only available outputs are PDF, Word, HTML, and XSL-FO. It would be very helpful to be able to choose the Excel output, as we can do in...

Envizi REST API updates

Using the supplied REST APIs, a client's metered data can be pulled for a single meter. Many clients will have multiple sites, potentially multiple floors (meters/sub-meters) and it would be beneficial in time, and resource usage, to be able to ca...

Detect and report extreme sized Erroneous Contents Fields to ensure such are identified and purged from system to ensure system performance and integrity

Contents Field has no size limits, as such erroneous imports are allowed with 1M+ characters. While such operations are supported, the system cannot handle such loads and crashes. Without prevention of such import operations of large size, system ...

Limit size of field: Contents to ensure system performs and responds timely

Near all ERM artifact attribute fields have size limits. However, the Contents field (rich text field) does not have a size limit. It should have a maximum size to ensure System integrity, response, usability, and performance. While user behavior ...

API: Adding other meter types to the API endpoint options

There is an Electricity Interval data extract report that is accessible via the UI as well as the API. We use this frequently for various reasons include external data validation. There is also a report that can be accessed via the UI, but not ava...
1 day ago in IBM Envizi - ESG Suite / Interval Meter Analytics 0 Submitted

All data loading entry points to be visible on the Files Uploaded Page

As it is right now, users are able to see any files that were loaded manually into Envizi via the manage >> Files Uploaded process. However, this will only show the manually entered ones. We have been able to successfully utilize the email d...