Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5766

Capability to assign attribute's enumeration in N*N format

We would like to have the feature implemented for attributes in RTC work item in such a way that the enumeration list of one attribute can be mapped to enumeration list of another attribute.
over 3 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Ability to set component to read only attached to streams

In ClearCase UCM you can configure a component to be set with read-only setting at a stream level which developers are not even able to modify read-only component in their workspace/sandbox. Similar functionality is required on RTC. Currently you ...
almost 5 years ago in IBM Engineering - Workflow Management / Source Control 2 Not under consideration

Ability to manage permissions through API

Currently, it si only possible to manage permissions manually.
about 6 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration

Ability to preconfigure the Columns appearing by default in Query creation editor

Steps:1. Navigate to any Project area in CCM (EWM/RTC)2. Click on Work Items Menu --> Create Query3. Click on the Column DisplayPlease Observe the Columns appearing by default. Expected: I shall be able to remove the unwanted default columns (A...
about 1 year ago in IBM Engineering - Workflow Management / Reporting 1 Future consideration

Change Data Types per group rather than individual when creating a Complex Device.

As a MAS Monitor user, I need to be able to setup and test physical and logical interfaces efficiently. Business Need/Problem: Today I can use a Complex Device, but then I have to change the Data Type for each Property individually rather than be...
about 1 year ago in IBM MAS - APM 1 Functionality already exists

provide in DNG a true CSV export option (not adding any special characters during the export)

Since you added a =" to all CSV Exports where numbers with delimiter are uses, e.g. for the "link by attribute" attribute 12345.12345 is output as ="12345.12345". You added this in "CSV Module Roundtrip with Excel can potentially corrupt textual d...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Re-implement Workflow Designer

The current state of the Workflow designer could be improved in several dimensions. The flow charting design tool is erratic and difficult to use, arbitrarily redrawing the canvas (and not in a particularly usable manner). The actual objects do no...
about 6 years ago in IBM MAS - Manage (Base) 1 Future consideration

Link technical publication to the OMP

Sometimes it is helpful to implement a Service Bulletin in the OMP e.g.: repetitive inspections. Most of the time you are performing the first inspection of the SB with the technical publication application (due to the revision process/interval of...
over 1 year ago in IBM MAS - Aviation 1 Future consideration

Attachment between comments of a review and the review

Currently, comments and reviews are totally independent.Indeed, after a comment wrote during a review, it is possible to modify and delete the comment after the end of the review.
over 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 0 Future consideration

Modified By in Task's module level validation workflow

Hi, The Modified By value in many a Work Tasks records is not consistent with the person who modified them. Please include the task in workflow (triTask - Synchronous - Module Level Business Rules) to include the task present in all other Module L...
7 months ago in IBM TRIRIGA Operations & Maintenance Management 1 Is a defect