Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2885

Make DOORS 9 ReqIF Import tolerate (extra) spaces between HTML tags for tables, lists and other structures

Different tools format data in different ways. Extra spaces may be used by some tools, and not by others. Currently DOORS 9 cannot tolerate extra spaces in some HTML tags, for example <td></td> works, but <td> </td> does not.
about 1 month ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Import 0 Future consideration

Maximo - Enhanced Auditing

The audit functionality in our version of Maximo (v7.6.1.1) is extremely limited. We have had to build our own custom functionality and feel that this would be a globally-desired auditing solution and would benefit from IBM development into an out...
over 1 year ago in IBM MAS - Manage (Base) 0 Future consideration

UID for Project\Folder should be generated at the time of creation for Migration Package

UID for Project\Folder should be generated at the time of creation for Migration Package to avoid conflicts. This is generated when the export is done. Generating the UID at different times causes confusion\conflict if there is a use case where th...

Suggest to the Rhapsody user that they should deliver their work if they attempt to unlock a modified unit

Rhapsody is allowing an unlock without delivering the changes. Some people have made this error, which is causing differences and a need to merge. The users are then failing to do a merge properly, which requires repairs.
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Adding additional variance comparison periods to the Power Reports as standard

Currently you are only able to compare the current year with the prior year. It would also be useful to us and I am sure other end users of the Envizi system to be able to compare this quarter with the current quarter and month on month comparisons.
6 months ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

Set a backgroud color of attributes depending on their value in DOORS Next requirements module.

Projects need DOORS Next to automatically set a backgroud color of attributes in their requirements module depending on conditions (attribute value). Background colors can be configured manually for each attribute.
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Include Market-Based emissions in Sustainability (Executive Report) PowerReport

Currently, the Sustainability (Executive Report) PowerReport provides a good performance overview, however, it only reflects location-based scope 2 emissions. It would be more beneficial to reflect market-based scope 2 emissions. Alternatively, it...
3 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

Bulk Move Work Items between Project Areas

IBM Engineering Workflow Management should allow bulk migration of work items between different project areas. This feature is available via API, which is officially unsupported.
3 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Show blank lines in data records to quickly show data gaps

Today Envizi does not show a break in lines within the account records when there are months of missing data, meaning you have to review date range to date range to find the missing months. Allowing for a blank line will bring quick awareness to w...
4 months ago in IBM Envizi - ESG Suite / Base Platform 1 Future consideration

Incorporate Maximo Data Loader into Manage

The aim is to incorporate the "Maximo Data Loader" into the MAS8 package, specifically installed as a component of Maximo for Civil Infrastructure. This integration will streamline the process of data loading into MAS8.
7 months ago in IBM MAS - Manage (Base) / Integration 1 Future consideration