Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2865

Date autofill when state changes in Test case

In the Test case, there will be one custom date type field. so whenever the state gets changed to "Ready for Review, " the system date should be auto-updated in that custom field. Is there any possible way to do it?
about 2 years ago in IBM Engineering - Test Management / Integrations 0 Future consideration

Creation of tags automatically once the model element is created in Rhapsody is not happening

Tags are not creating automatically once the model element is created in rhapsody 8.3.1/8.4.
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 0 Future consideration

Provide a new predecessor-successor constraint type.

Introduce a new parameter regarding the feasibility of the dependency decleared for an operation and its predecessor. It will be marked as a YES/NOT choice. When, the dependency is "Feasible", it is mandatory to be respected (it will be treated as...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Create dependecy type to avoid tasks to be scheduled in parallel

Add a new constraint that avoids two task to be scheduled simultaneously. Tasks might be scheduled before or after but never in parallel. The constraint will be addressed as "NOTINPARALLEL".
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Zone exclusion

Exclude operations to be scheduled in a zone based on the work scheduled
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Declaration of max duration of parent work order to improve declaration of the work order inside HSOC

Add a new kind of constraint on envelop work order to limit its duration (and the duration of its children). Needed to act on the following modules: - Add a new field in the work order view to manage the max duration Optimization - Add parameters ...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Enable ordering/alphabetical ordering for specified items

There is this option from the Rhapsody menu:Select View > Browser Display Options > Enable OrderingIn case it is not checked, the elements will be in alphabetical order.This applies to all the project elements.It would be nice if there would...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 1 Future consideration

Enable End Users with visibility into KPI performance

From a Customer Success POV, it is important that customers can see clearly how the application is providing them benefits. To that end, we should ensure that customers have a way to see these KPI results (and CSMs can underscore that performance ...
about 2 years ago in IBM MAS - Manage (Base) 0 Future consideration

Enhancement to Meter Based PMs

When job plan sequencing is used on Meter Based PMs AND there is a sudden spike in the reading Maximo does not adjust to pull the accurate JP but issues a work orders as per the job plan sequence. The JP Selection logic assumes that meter reading ...
almost 9 years ago in IBM MAS - Manage (Base) 1 Future consideration

Have any meter reading entered from an Inspection into the WOMETER table when that inspection was raised from a work order

Today, when you enter a meter reading from the work order, it is logged into the WOMETER and the other relevant meter reading tables, however, when the reading is entered via an Inspection that was raised from a work order, it is not. In order to...
about 2 years ago in IBM MAS - Manage (Base) 0 Future consideration