Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Workflow Management

Showing 530

The association of a second workitem with the option checkin and associate work item does not give rise to the creation of a second changset

Promote the correct assignment of WIs during Check-ins
almost 2 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Enable bidirectional linking between Configurations and Work Items

In order to successfully use systems engineering on the Jazz platform, configuration managers in combination with structured change management are required, especially for increasingly complex topics. For the role of the configuration manager, a t...
almost 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Drag and drop from Microsoft Outlook to CLM

Drag and drop from Outlook does not work. You always have to save the mail (or doc) first. Can this be improved?
over 5 years ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Allow Kanban WIP to be more defined to individual

Kanban template in RTC normal planning allows for WIP for columns "by group" which is great for large groups and complex design. However, for smaller groups, we would like to group by owner, and then use WIP to limit the amount of work by that owner.
over 5 years ago in IBM Engineering - Workflow Management / Planning 2 Not under consideration

Would like better integration between EWM Source Control and Microsoft office: in particular, use of WEBDAV

There is currently a very weak or even no integration possibility between Microsoft Office toolset (MS-Word, MS-Excel, MS-Powerpoint, etc...) and the Jazz/RTC/EWM Source Control. We would like to have an integration where it would be possible to d...
over 2 years ago in IBM Engineering - Workflow Management / Source Control 2 Not under consideration

Work Item Copy should be able to include links

When creating a Work Item copy using the 'Create Work Item Copy' button on the work item form, users would like the option to also copy existing links from the source work item to the target. Today only the 'copied from' and 'mentions' are populat...
almost 3 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration

Attribute Customization Logs contain too many exceptions, which affects the readability of logs.

Attribute Customization Logs contain too many exceptions, which affects the readability of logs. Therefore, you can save the logs to a single log file to avoid interference by log4j.
11 months ago in IBM Engineering - Workflow Management / Usability 2 Not under consideration

Search box glitch - In EWM after work item is loaded focus should not be set to the summary field.

In EWM after work item is loaded the focus is always set to the summary field. This different than in ETM or ERM.With slow network connection following annoying behavior can occur:1) open a work item (e.g. duplicate browser tab of existing work it...
almost 2 years ago in IBM Engineering - Workflow Management / Usability 1 Future consideration

Create a expand keyword to control the versionId of additional document formats such as Word files

We know that there are expand keywords that can be used with the scm load command in order to print in the file the version provided by the source control tool when it is downloaded. However, the specific expand keyword $VersionId$ only works for ...
almost 3 years ago in IBM Engineering - Workflow Management / Usability 4 Not under consideration

Visual Studio installation parameters

We would like to be able to automatically configure RTC options in Visual Studio via script.The options that we would like to automacially set are:Automatically detect when file [...] -> TrueCheck for changes immediately [...] -> TrueRefresh...
over 5 years ago in IBM Engineering - Workflow Management / Integrations 2 Not under consideration