Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2854

Re-establish requirements links to rhapsody models

I have the following scenario regarding preserving requirements links in models when importing into ELM: -I have a reqif/mgiz file from DOORS V9.6.X that I want to import into DOORS Next -This files has linkages to rhapsody models that are also go...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

SE Toolkit to check remote resource connection and issue warning before execution

Some of the SE Toolkit helpers establish OSLC links, like Create Sequence diagram, Merge Functional Analysis and Merge Block Features (and potentially others).OSLC Link creation can only be successful, if the remote resources are connected, i.e. t...
about 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 0 Future consideration

Duty stations narrative log does not auto refresh itself.

EOM DS doesn't refresh itself. It behaves like any other list view in Maximo.
over 9 years ago in IBM MAS - Nuclear 4 Future consideration

Remotely accessible device app logs

Currently the device app logs are only accessible by someone who has both a mac and the phone you want the logs from. When phones are placed for inspections, they are often difficult to reach to acquire these logs. With as critical as these logs a...
about 3 years ago in IBM MAS - Visual Inspection 0 Future consideration

additional use cases for customized attributes in EWM SCM: JRS report on customized attributes

Current situation: As a user, it is not possible currently to select the custom attribute in the condition field of JRS.Request: As a user, I shall be able to report on custom attribute, which are set to the change set and to the files.
about 3 years ago in IBM Engineering - Workflow Management / Source Control 2 Future consideration

PM Interval Reset

When a work order for a meter based PM is completed, the current meter reading on the asset is used to update the PM. The meter reading entered on the work order when the work was completed should be used to update the PM rather than the current r...
over 9 years ago in IBM MAS - Manage (Base) 2 Future consideration

Rhapsody Output Window Text Colour

I would like to be able to change the text colour in Rhapsody's output window. I've tried sending ANSI control characters to the API method writeToOutputWindow(), but they were ignored.I've raised this issue with IBM support (case TS006795261) who...
about 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Code and Execution 0 Future consideration

Technote needed: Committing transactions to continuous vs. sequential queues

A blurb from an email from IBM: Continuous queues use MDBs which use container transactions. So when the transaction completes it is automatically committed. Sequential queues, on the other hand, have a cron task which delivers messages to Maximo ...
about 3 years ago in IBM MAS - Manage (Base) 2 Future consideration

Make Rhapsody Picker Accessible from API

Rhapsody currently has an out-of-the-box "picker", which is a filterable view of the model browser that allows users to browse/select elements. This request is to make the picker accessible from the Rhapsody API.
about 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 0 Future consideration

Documentation: Views

Please update the Maximo Views documentation. The documentation should include things like: The difference between imported views vs. views created in Maximo. Imported view objects are read-only, non-imported views are editable. Imported view calc...
about 3 years ago in IBM MAS - Manage (Base) 4 Future consideration