Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2862

E-signature does not work with Workflow

When changing a status from workflow this should take into account the electronic signature that is set on the “Change Status” action.This has worked in earlier versions of Maximo but does not work anymore in Maximo 7.6
over 9 years ago in IBM MAS - Manage (Base) 1 Future consideration

allowing workflow to continue after dismissing messages or functions spawned by the interaction node

Please allow the workflow to continue after dismissing messages or functions spawned by the interaction node, without requiring the user to click the workflow button again.
over 9 years ago in IBM MAS - Manage (Base) 3 Future consideration

Add Progress bar in Feature window

We are using lot of proxy port in our model, each proxy ports has some tags which explains its properties. We selected multiple proxy ports (let say more than 500) and launched the feature window.Rhapsody takes some time to load the feature window...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration

RPSEARCHMANAGER Interface in Rhapsody should be provided to customers as well for use.

The methods provided by IRPSearchManager Interface can be used for finding elements with particular stereotype applied to them programmatically using RhapsodyAPI. The code using this interface works correctly when plugin are run from Rhapsody GUI ...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration

Feature to select ActionPins to be shown in Activity diagram

When we want to re-use an activity in another activity diagram as call-behaviour, we drag & drop activity into the diagram which will show call-behaviour with all the ActionPins. We need to remove the pins one by one which are not going to be ...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Specifying an Attribute as "Volatile"

Currently an attribute can be set as volatile by using the property - "CPP_CG::Attribute::IsVolatile" This info is not visible in the Features:: General tab. Some of the users is not aware of such a property and not able to specify the attribute a...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

State chart with missing menu entry "Simulate"

Actor: Need of Simulate Menu for StateMachine once after extending custom profile from SysML Profile. Description:We have created a customized profile named "BBM_MBSE_Framework" which is a modified copy of "SysML" Profile. Later, we found the menu...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

7612 Scheduler Plus Graphical Scheduling Application Issue

In Graphical Scheduling, I am comparing a schedule with a scenario. The differences can be seen in Work view Tab but cost differences are not shown in Compare Cost Tab.
over 3 years ago in IBM MAS - Scheduler 2 Future consideration

ALM to Prevent empty comments after a change set is delivered

ALM should prohibit user empty comments after a change set is delivered
over 3 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Rhapsody API Support to move model browser elements

We would like to have the possibility of moving elements in rhapsody browser like moving a proxy port above another as we would drag and drop it between two other proxy ports or move an enumeration literal up or down as if you would click on the “...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration