Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5785 of 5785

Capability for Maximo MXRECEIPT OLSC API to provide JSON Response.

Steps: Using Postman: Send Receiving data to ../maximo/oslc/os/MXRECEIPT?lean=1 Header properties=* or specify the field name: matrectransid, siteid Expected Result: 200 or 201 - Success and JSON Response data is returned back. Actual Result = 200...
about 3 years ago in IBM MAS - Manage (Base) / Integration 0 Future consideration

Maximo Anywhere 7.6.4 does not have dropdowns

Anywhere does not have drop down control for transactional screens. Our client requires drop downs rather than Look ups or combo boxs
about 3 years ago in IBM MAS - Mobile 2 Functionality already exists

Disallow partial inspection of rotating items or Allow serialization of partially inspected rotating items

Below are the step to reproduce this scenario. 1-->Go to Item Master and create a new item and make it active. 2-->Ensure Inspection Required flag and Rotating flag is checked. 3-->Add the item to a storeroom 4-->Create a PO and add t...
over 2 years ago in IBM MAS - Manage (Base) 0 Future consideration

Data Warehouse reporting should restrict work item visibility based on EWM Access groups

This is a compliance issue. We use Access Groups to restrict visibility of sensitive data in EWM, but when reporting in Report Builder or BIRT all work items in a project or team are visible.
over 2 years ago in IBM Engineering - Reporting / Data Collection Component 5 Future consideration

JRS ( Report Builder) does not display the full hierarchy of the category from RTC - It shall be configurable in JRS or RTC

If we have 3-4 layers of the category (filed Against) in JRS, The JRS only displays two layers. I had an exchange with Fariz and learned that its designed that way to solve some performance issue. However, Fariz also suggested to proceed with the ...
10 months ago in IBM Engineering - Reporting / JRS 1 Future consideration

SCM - Check if a Stream or Component name is unique

Current situation: If a new stream or component in SCM will be created SCM does not check if the same stream or component name already exists in the PA. This could lead to confusion for the SCM users. Required situation/Proposal: It is requested t...
10 months ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Crosscheck/clarify how attachments are referenced in ETM artefacts

Currently the attachment referencing is done based on the naming of the attachment and not via the combination name + ID. In case an attachment is removed from the test artefact (e.g. test case) it is not possible to identify in the history of the...
10 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

SCM upload status in Web View

Current behavior: When uploading a new document, there is no status regarding the upload state Requested change: When uploading a new document, to have a status regarding the upload state (E.g. in % (percentage)). It should be visible that there i...
10 months ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Maximo Mobile - Sliding Drawer Behavior - Error Handling - During save in Sliding drawer if any error occurs, then user can not edit the input in sliding drawer because sliding drawer gets closed and then user need to redo everything

In Maximo Mobile, there is a sliding drawer component. In this, user fills all the input and then click on save. If any error occurs during SAVE, then error message will show. Post error message, user cannot come back to SLIDING DRAWER component. ...
10 months ago in IBM MAS - Mobile 2 Not under consideration

Removal of changeset link to workitem when discarding changeset.

Hello,we regularly have some trouble during workitem promotion. These cases are linked to changesets that where discarded without having first the link to workitem removed. This changesets were never promoted and limited to the developer workspace...
almost 5 years ago in IBM Engineering - Workflow Management / Work Items 0 Future consideration