Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5910

Missing coverage line after Asset Warranty Contracts (Tr) revision

After an Asset Warranty Contrats (Tr) revision, coverage lines added with the revision are not applied to existing assets.
over 3 years ago in IBM MAS - Transportation 0 Future consideration

Travel button configurable to be invoked on demand irrespective of gps location from store

Standard Maximo automatically displays Start travel button based on the technician location from Store. If technician is within the radius value specified in the system property, the travel button will not be displayed. At Woolworths, start travel...
over 1 year ago in IBM MAS - Mobile 1 Planned for future release

SRMOBILE - Barcode scanner opens the front camera by default, and the button to click back camera doesn't switch camera easily with a single click, sometimes it needs to be clicked multiple times.

In Maximo SRMobile role-based application to scan the barcode of an asset or location, the barcode scanner opens the front camera by default and the button to click the back camera doesn't switch cameras easily with a single click, sometimes it ne...
over 1 year ago in IBM MAS - Mobile 0 Future consideration

SRMOBILE - Attachments(images) are moveable in the service requests.

In Maximo SRMobile role-based application, the attachments(images) are moveable in service requests. Steps to replicate: 1. Login to SRMobile(Role based application) through below link- https://<MAXIMO_HOST>/maximo/oslc/graphite/srmob...
over 1 year ago in IBM MAS - Mobile 1 Not under consideration

Ambigous information regarding setting up RPE templates in Jazz (RM) server

The following IBM knowledge centre link is not clear enough:https://www.ibm.com/docs/en/elm/6.0.6.1?topic=adsr-setting-up-document-style-reports-from-rpe-templates#rm_t_impt_cust_doc_report Especially regarding how to name a Word template (.doc fi...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Unassigned 0 Not under consideration

In Review comments it is not possible to assign/ask a person

In the discussion and comment fields it is possible to use the @ operator to assign/ask a person directly. This mechanism seems not to work for review comments within DNG. It would be good if this feature from RTC would also be available for revie...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Enable suspect links for artifact children changes

At the moment OSLC (agreed) links between DNG artifacts and RMM artifacts do not become suspect when a child object of an RMM artifact is changed. An example is a link from a DNG artifact to a "logical exchange" in RMM. When an attribute of a flow...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Support lookups on smart-input for numeric attributes

The smart-input control supports lookup for ALN based attributes but not for numeric attributes like wopriority. This requires customers to use a field control with a button instead to launch the lookup like: <border-layout fill-parent="true" p...
over 1 year ago in IBM MAS - Mobile 0 Future consideration

Java API doesn't provide translated label

The labels of the query do not get translated in the Business Connect API. TRIRIGA will translate the column labels in regular reports, but the API doesn't. For example, city will be translated to ville for a French user. Our ideal solution we wou...
over 3 years ago in IBM TRIRIGA Application Platform 1 Future consideration

Work Item Import: Allow save of incomplete mapping file and import only mapped columns

This belongs to the possibility to import work items from an csv-file. It is possible to create a mapping file between the columns in the csv-file and the attributes in the work item type. It is required to map all columns in the csv-file, before ...
over 1 year ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration