Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 950

In Mas 8.11, End Measure Value should not be editable on point type feature label for linear assets.

In Case of Linear Asset, when user is trying to enter a meter reading and select a Reference Point as Point type feature Label, it is allowing user to enter the start measure and end measure both, whereas it should allow user only to enter a start...
8 months ago in IBM MAS - Manage (Base) 1 Not under consideration

Move/Swap/Modify action not setting the replacement asset on work order

Steps to Reproduce: 1--> Create a work order with a Location and select any asset under that location 2--> Click on the Move/Swap/Modify action under More Actions 3--> Under the Move/Swap tab select the checkbox "Is this an Asset Swap?" 4...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Work Orders (RBA) - Log Notes on a work order should show the class and record that created the log note and to be able to filter by that record.

A work order can be created from an originating service request, the log notes from the SR can be seen from the work order. A work order can create multiple follow-up work orders, the log notes from those follow-up work orders are also visible on ...
8 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Work Orders (RBA) - When a work order has an owner group, the selection of an owner should be filtered for the current owner group but with the ability to change to an owner belonging to a different owner group

On the Work Orders role-based application the changing of owner and owner group should align with the way it works in Work Order and Ticket based applications. If the current owner group is SECURITY, then when you look to select an Owner for the w...
8 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Not under consideration

Maximo join

In order to analyse the cron task instance (start/end time and JVM which ran the cron) that ran a scheduled report, a relationship is required between the REPORTUSAGELOG table and CRONTASKINSTANCE table. Although this info may be captured in Syste...
over 3 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Maximo Inspections forms - Signing off inspections as additional fields of forms

Add additional section of forms in order to comply with ones of the most important parts of an inspections " Signing off inspections" of the involved person (at least two person/user involved = responsable and supervisor).
over 3 years ago in IBM MAS - Manage (Base) 4 Planned for future release

Work Order Tracking - new action Create PR for direct issue materials and services

In the Work Plan Materials and Services an item can be marked as Direct Issue with/without a vendor. When the Work Order has reached approved status and there are direct issue planned materials and services without a PR/Line reference, then the ne...
8 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Work Order (RBA) - Work Order List, should have additional filter fields in right hand panel

In the Role Based Application - Work Orders, you come initially to a list of work orders with the filter record displayed below the column headers. On the right-hand side is a filter field which opens a panel on the right with several fields, this...
8 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Work Order (Role Based Application) - Enhancements to the List view to make it more practical

When you enter the Work Order Role Based Application you come to the List view where all the columns are fixed width. It would be more practical if the Work Order number, Status, Scheduled Start and Work Type were made smaller to provide extra wid...
8 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Not under consideration

Integration time POP email - Temps intégration emails POP (MV2-2097)

The crontask that integrates enova.ca@laposte.fr emails takes 5min at each pass since the MELPOSTE (IMAP) to .COM1 (POP) switch, whereas it is supposed to run every 2min. When I empty the inbox (manually moving emails to a sub-folder), the process...
about 4 years ago in IBM MAS - Manage (Base) 2 Future consideration