Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5832 of 5832

[Shifts] Task exclusivity for shifts

The idea is to have a task pre-decleared to only be performed during a specific shift.
about 2 years ago in IBM MAS - Scheduler 1 Future consideration

[Optim Result] Include Resources KPIs in Optimizer extract

Provide in the Optimizer extract KPIs to track the craft and the zone usage after obtaining the optimization result.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Cross-Application Global Configuration Component Creation

It would be nice to have a central place to create new components and streams across multiple applications (RM, QM, CCM) to build into a global configuration, especially for projects/industries where systems have many components.
about 2 years ago in IBM Engineering - Foundation/Common Services 3 Not under consideration

[Execution] On-hold workload management

When many tasks are blocked/onhold at the end of the shift, not enough job might provided due to delay of successors until the completion of the blocked predecessors. The solution to this issue might be linked to the use of logic/feasible flags in...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Execution] In Progress management

The operations that have the "In progress" status, are always scheduled at the beginning of the next shift. However, two improvements are proposed: 1-Using the remaining duration and rescheduling the operation equal to the duration of a predefine...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Limit maximum delay between predecessor Successor

Task A is predecessor of Task B. Therefore, with this feature the user establishes that Task B must be performed within a certain maximum time interval after the end/start of Task A.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Manage multiple qualifications

Management of resources with multiple qualifications (e.g.: mechanics able to work on A320 and A350, mechanics allowed to work on AF and AV tasks) and allow the optimiser to choose the allocation.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Critical Path calculation (dependencies + resources)

The aim of the critical path (CP) is to obtain a list of constraints (precedence, date, operation attributes...) that are critical and/or limiting in the proposed solution to evaluate the risk of having delays on them or to define which ones can b...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Need only the due date of the approval of work item in E-Mail notification

Hi Team, I have been told by the IBM PMR guy to raise this RFE as we need urgent support on E-Mail approval due date, Requirement here is that I want only the due date(ex: 26-Jul-2020) in the E-Mail notification, this due date is of the due date o...
over 4 years ago in IBM Engineering - Foundation/Common Services / Administration 3 Future consideration

Collection based on a condition

Have a conditional expression as an option on Collections with the ability to control the population of the collection based on the condition.
almost 11 years ago in IBM MAS - Maximo IT 3 Not under consideration