Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5912

Replace in GC does not work for SCM and RMM

Replace in GC does not work for SCM and RMM: In GC there is a replace function that is supposed to replace a configuration with a related configuration. This function allows to replace a configuration with any configuration in the same component. ...
about 2 years ago in IBM Engineering - Workflow Management 1 Future consideration

Improve visualization of Program Board

• Summary of features is missing. Can we have a bigger card that also shows directly the summary of the feature? The ids are good as reference, but from the id we dont know the content. The summary should be shown, then people know what is done in...
about 2 years ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Cross Server Re-Use of RMM Component does not work

Currently we have a use case to place all the standard profiles ,Reference Architecture Model in a federated server e.g amfed Allow BA to Add Components from amfed to am1,am2...amx server using "Add Component" from another repository server To a...
about 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 6 Not under consideration

Creation of tags automatically once the model element is created in Rhapsody is not happening

Tags are not creating automatically once the model element is created in rhapsody 8.3.1/8.4.
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 0 Future consideration

Display images in Object Text in Object Properties

Currently only a plain-text placeholder is displayed ("") which does not allow to draw conclusions regarding the content of the image. For users who use the object properties to review object content, displaying the placeholder has limited value.

Linear - Create Static Linear Meters

There is currently no control to say that a meter on a linear asset is at a fixed location, meter readings can be taken at any measurement along the linear asset, or the meter reading is associated with a fixed asset. There are cases where you wa...
about 2 years ago in IBM MAS - Manage (Base) 1 Future consideration

Formal Review comments should be able to responded to and closed an owner.

If a reviewer raised comments in a formal review there should be a way to resolve/reject the comments to alow the approver to make an informed decision. At the moment there is not way to determine if the comments are valid/resolved before approvin...
about 2 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

Test Step comments need to support more than 128 characters

When trying to enter comments against a test step it is limited in length. Ideally we would be able to attach multiple comments in RTF format or allowed to attach long text to capture comments from test step.
about 2 years ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Allow Modules and Collection to link directly to stories in EWM

Linking to Dev Plans is great but what about linking a module or a collection directly to the EWM story?
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

Allow users to choose base or module artifact when creating link in a module

Base and module artifacts are confusing, but the feature of being able to create links between artifacts in modules is a great feature. If users could choose at this point whether to link to the base artifact, this would help to limit the mish mas...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration