Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5781

RQM: display additional test case information during test execution.

Scenario 1 - During execution of a test case WITHOUT a test script the following Test Case sections are shown:1) Test Description2) Pre-Condition3) Expected Results4) Post-Condition Scenario 2 - With a linked Test Script only the following section...
over 5 years ago in IBM Engineering - Test Management / Unassigned 1 Not under consideration

Incoming links from other applications to DNG should create an entry in the audit history

There is an inconsistency in how DOORS Next Generation records backlinks (incoming links) in its audit history. Scenario 1: In a non-CM enabled project, where it is associated to some other project in, for example EWM, and where a link is created ...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

Remove time portion of datetime field in comm templates

Would like comm templates to support DATE conversion functions. I was told on Case TS008555377 that communication templates do not support DATE conversion functions and the only way to modify the format of datetime fields on comm templates is via ...
over 2 years ago in IBM MAS - Common Services 2 Not under consideration

Easier way to change order of Test Case in a Test Plan

Sometimes the sequence of Tests Cases in a list is not as desired, then RQM users need to change it to fit on the execution needing, perhaps depending of how long the list looks like, the way available is not performatic.
over 5 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration

Labor rate contracts and planned updates

Labor rate contracts As a Maximo Specialist or a Maximo SysAdmin, I kindly ask to have the possibility to update existing Labor Rate Contracts with new prices and plan a specific activation date for when the new prices will be the ones in play, so...
over 2 years ago in IBM MAS - Manage (Base) / Supply Chain 1 Future consideration

Easy administration of data and actions to be done when trusted coworkers leave the company

Easy administration of data and actions to be done when trusted coworkers leave the company Being the MaxAdmin, I need to have an extra tab in the Person app, so that I easily can see where a specific user has links into data, so that I would know...
over 2 years ago in IBM MAS - Manage (Base) 0 Future consideration

Widget on the WO app (Actuals) which mirrors all PO information

Being a Maximo user, I need to have full insight into the PO information from the Actuals tab, so that I can see all relevant PO information directly in the WO app without having to open the PO app. This is a great help for all internal Maximo use...
over 2 years ago in IBM MAS - Manage (Base) / Supply Chain 0 Future consideration

Load mechanism for Vendors’ Hours, Material, Services and Tools costs​

Load mechanism for Vendors’ Hours, Material, Services and Tools costs​ - specification files describing amount of hours (person, skill level, craft rate) + which Services, Materials or Tools have been used on a specific WO​ - should elim...
over 2 years ago in IBM MAS - Manage (Base) 2 Future consideration

Built-in functionality to do batch approvals of labor should be adjusted

Maximo has built-in functionality to do batch approvals of labor. It is, however, a very powerful tool. Seems from the perspective of MaxAdmin, it is too powerful. Few adjustments and the tool is for everyone. As an AOM, I need to be informed abou...
over 2 years ago in IBM MAS - Manage (Base) / Supply Chain 0 Future consideration

Ability to do receipts within the actual tab on the WO​

Being the Asset Operational Manager as well as the Contractor Lead, all daily work is concentrated on the WO. What's to be done, what's planned, which costs, reporting on performed work etc. End of the day, WOs completed by the contractor are subj...
over 2 years ago in IBM MAS - Manage (Base) / Supply Chain 0 Future consideration