Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2924

Technician (RBA) - Create and Update Tasks

There should be the ability to create tasks and update them particularly the description and long description. Not all job plans will have tasks and senior technicians may create these as they are performing the work, so that later they can be use...
11 months ago in IBM MAS - Mobile 0 Future consideration

Be able to move test executions retrospectively

The idea is to be able to move test executions retrospectively. For example after a standalone execution, into a specific test plan or into a specific test suite execution record. This is needed so that test suite execution report (for example)is ...
9 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

[CMMC] Distinguish between Active and Inactive Users

As a part of the CMMC program, there is a need to distinguish between Active and Inactive User sessions in the ELM Suite. AC.3.019 requires that user sessions that have been inactive for a specific time period be terminated. In order to implement ...
over 2 years ago in IBM Engineering - Foundation/Common Services 2 Future consideration

Provide basic version control of template/reports assets

It is important that we know which template generated a report. It would be ideal if each version of the template that is uploaded to document builder maintained a version number. Added to this there should be an ability to switch to a version of ...
about 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Documentation Builder 2 Future consideration

Create an "undo" button that does not force exit out of the record being viewed. Using "clear changes" exits out of a record when using it.

Everyone will benefit from this. Being able to undo changes, without having to remember what record you were viewing will increase efficiency and functionality.
3 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Allow hiding Value Property type from display.

When a Value Property is added to a diagram such as a BDD, its type is displayed. On other elements, their display can be modified and their type masked, but not on Value Properties. Please add this for harmonisation.
3 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Possibility of defining “Validated by” link constraints between ERM and ETM

See the screenshot "2024-07-09 12_34_01-Window.png". The QM Test Case 364 validate the RM artifacts 45130, 43907, 43390 and 43391 45130 is a "Heading" artifact 43907 is an "Information" artifact 43390 and 43391 are "Requirement" artifacts In our i...
6 months ago in IBM Engineering - Test Management / Administration 0 Future consideration

Add the ability to assign an As-Designed space class via the Revit BIM Connector to new and existing space records

Please add the ability to assign an as-designed space class via the Revit BIM Connector to new and existing space records. This would be helpful for projects that are under construction. Currently, we assign a normal (final) space class and an as-...
about 2 years ago in IBM TRIRIGA Application Platform 1 Future consideration

Automatic Detection of Glossary Terms

When writing text (artifact content), DNG shall automatically detect if a word is defined as glossary term.If a glossary term is created, DNG should automatically detect duplicated and give a warning.Use Case: Improved Usage of Glossary Terms; Con...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Ability to add multiple inspection forms to a single work order

Inspection forms is one of the best features of Maximo Mobile and a lot of customers are adopting this product. Major draw back that we have encountered with inspection forms is that Users can associate only 1 inspection form to a work order. We a...
almost 2 years ago in IBM MAS - Mobile 1 Future consideration