Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2863

Add Functionality to send reports with parameters from an escalation or add a condition field to report administration

Escalations should have a third tab next to Actions and Notifications to be able to send a report with its parameters. There a times where we want to monitor certain things where situations may or may not occur. Rather than having one communicatio...
2 months ago in IBM MAS - Manage (Base) / Reporting 0 Future consideration

Improve loading time of Remote artifacts

Loading artifacts in Rhapsody takes sometimes a very long time, and also no real feedback or progress bar is provided. In general also the RMM connection almost doubles the loading times of models on the client side, as measured in our projects. R...
5 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration

MAS Licensing Allowing for separate Suite License Servers

Modify MAS to integrate to multiple Suite License servers. New users would be associated to a default license server. Optionally, when adding new users we would like to be able to associate users with a secondary license server. These secondary li...
about 1 year ago in IBM MAS - Common Services 2 Future consideration

Increase Group Admin capabilities on their Managed Groups.

Currently there is a big restriction on Group Admins compared to Organisation-level admins. Group Admins do not have the admin tab available meaning that they cannot add custom emission factors, add new users via the contacts and logins page etc. ...
7 months ago in IBM Envizi - ESG Suite / Base Platform 5 Future consideration

Base Artifact Link Constraint

This customer commits to enforce usage of Artifacts in Modules with Modules in Streams and Streams in Components and Components in approved GCs. Further Base artifacts are only legally and compliantly utilized when included inside Modules. This co...
2 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Automated extraction of data from uploaded documents

To have the ability to upload an invoice to Envizi and for the pertinent information to be extracted would be a game changer and save so much time. The auditability of the data would be second to none and the way it would help avoid human errors w...
3 months ago in IBM Envizi - ESG Suite / Data Connectors & Integrations 0 Future consideration

MAS Mobile does not allow non inventory tools to report Actuals

Background: Maximo Manage Base is designed to allow actuals usage reported by the non iventory tools but when it comes to Mobile that's being restricted. Looks really weird that both the platforms are not in sync. As a customer I would think both ...
6 months ago in IBM MAS - Mobile 2 Future consideration

Enable ability to create a report of historical trends on requirements workflow states in ELM

Hi Team, We would like to create a report of historical trends on requirements workflow states. Initially, considering the links below, it seemed to be possible. https:/www.ibm.com/docs/en/engineering-lifecycle-management-suite/lifecycle-managemen...
about 2 months ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Updates from Classification are reflected on Asset Templates

Product: Maximo Asset Management Subcomponent: Asset Templates Operating system: All Description: When classifications are updated on the specifications tab the associated asset templates should be updated. For example, when adding an attribute to...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Ability to find and replace words across artifacts in a different modules

It would give document holders a way to change words across a series of documents instantly. Say if acronym x is now y, they could search all of the artifacts in their modules and change it.
3 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration