Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5820

RS burger menu missing project areas

Case numberTS005134466 The new "burger" menu in RS in 7.0.2 does not match the menu of the remaining suite. Its only prossible to see the "all projects" and not the actual projects the user has access to.
over 3 years ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Add ability to delete meter readings in Edit Meter Reading History

Users are requesting the ability to delete erroneous meter readings in Edit Meter Reading History. They are unable to modify the meter reading date and therefore need the ability to delete bad records. A conference call was held 10/9/13 with Ed Jo...
about 11 years ago in IBM MAS - Manage (Base) / Integration 2 Not under consideration

Enhance Initial Size of Nested Proxy ports

We are drawing nested proxy ports and even though the part is big enough, the initial size of the port is not big enough, thus resulting in labels of port to get align very close We expect that the initial size of ports should be decided based on ...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Allow adding of anchors to the elements in Referenced Profiles

In Rhapsody, if an anchor needs to be added to an element which is in a Referenced Profile an error is thrown as "Couldn't modify read only elements". But whereas a dependency can be added to the same element which is in a Referenced Profile. To w...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Bifurcation of Land and Buildings” and addition of Stand-alone component

PMR ID: TS004532142In Tririga application ver 10.5.3.5, platform ver 3.6.0.2, Within the Tririga system users are currently unable to:1) Separately classify and account for Land and Building components with shared payment schedule(s) under a singl...
over 3 years ago in IBM TRIRIGA Real Estate & Lease Accounting Management 3 Future consideration

Cash flow reports do not include all Rental prepayments and Tenant allowance incentive

TS004525148 - Cash flow reports do not include all Rental prepayments and Tenant allowance incentive
over 3 years ago in IBM TRIRIGA Real Estate & Lease Accounting Management 3 Future consideration

Cannot Select 0% to Allocate Occupancy or Chargback. Need to be able to select 0% for one Org and 100% for another

In the Space Form, on the Allocations tab, in the Occupancy Allocations or Chargeback Allocations section, TRIRIGA won't accept that I intentionally want to override to 0%. There are times that I want to override to mark one of the allocation reco...
over 7 years ago in IBM TRIRIGA Space Management 3 Future consideration

Space Assessment App - UX look & Feel

UI on iPad is not perfect. Slight adjustments should be made to align text, prevent text from overflowin into graphic area
over 7 years ago in IBM TRIRIGA Space Management 2 Not under consideration

Ability to add Pre-conditions to all testcases simultaneously

Currently, in RQM, we have to add pre-condition to testcases -> one testcase at a time -> by opening the testcase in a separate tab and add precondition informationIf the Test Plan has 40 testcases and all testcases have same precondition, i...
almost 4 years ago in IBM Engineering - Test Management / Usability 2 Not under consideration

Ability to see testcase details in the same pane as the test case list view

Currently, in RQM, we have testcases listed in list view. To review testcase information like pre-condition, test steps and expected results, we have to open the testcase in a separate tab or separate view and we can review all the information for...
almost 4 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration